To:
From:
Re:
E. Motion:
Attachments:
Discussion:
City of Nashua, Public Works Division
Board of Public Works Meeting Date: September 28, 2017
Noelle Osborne, Plant Operations Supervisor
Wastewater Department
Hach Brand Monitoring Equipment Purchase
To approve the purchase of monitoring instrumentation for the Wet Weather
Facility from Hach Company of Loveland, CO in the amount of $25,631.95.
Funding will be through: Department: 169 Wastewater; Fund: WERF; Account
Category: 71 Equipment.
Hach Quote
Operators use pH and Total Suspended Solids as measurements to determine the
quality of treatment as well as make adjustments to the chemical treatment
process. These instruments have a lifespan and are currently approaching the end
of their useful life. It is prudent to replace these instruments prior to them ceasing
to function, which will result in a decrease in the quality of treatment. The
Wastewater Facility respectfully requests to replace the Wet Weather Raw Water
Turbidmeter (WW-RWT), the Wet Weather Settled Water Turbidmeter (WW-
SWT), the pH meters (WW-pHM), as well as the associated controlling modules.
These are direct replacement with Hach as the sole source and are FY18
scheduled replacements within the Wastewater Equipment Replacement Fund
(WERF).