Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 11/15/2017 - P381

Finance Committee - Agenda - 11/15/2017 - P381

By dnadmin on Mon, 11/07/2022 - 10:19
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
381
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

Project Number: 228730 WWTE SCADA Upgrades
Issue Date: August 2017 Nashua, NH

b. Installation and operation manuals for all major control panel
components, including the network switches, PLCs, I/O modules,
communication equipment.

Closeout and Maintenance Material Submittals: per Division 01 General
Requirements.

1.06 QUALITY ASSURANCE

A.

B.

Provide in accordance with Division 01 General Requirements.

Control panel fabricator, Panel Shop, shall hold a valid Underwriters' Laboratory,
Inc. (UL) UL-508A certification for their panel fabrication facility, and shall have
executed a minimum of 3 Projects of similar scope in the municipal water and
wastewater markets in the past 5 years.

Surge protection shall be provided by recognized manufacturer with a minimum
of 5 years’ experience in the production of this equipment.

1.07 DELIVERY, STORAGE, AND HANDLING

A.

B.

Provide in accordance with Division 01 General Requirements.

Coordinate equipment, instrument, and material delivery to coincide with the
Project schedule. If the delivery schedule of any equipment, instrument, or
material shall affect the overall Project schedule, notify the Engineer in writing
immediately. Include in the written notification, documentation from the
equipment Supplier indicating the revised delivery schedule and reason for the
change.

When applicable, coordinate delivery equipment, instruments, or materials to be
delivered directly to another trade or vendor for installation in a system or control
panel provided under another Specification section.

Exercise care while loading, unloading and transporting equipment, instruments
and materials to avoid damage. Check all equipment, instruments, and materials
for damage or defects within 7 days of delivery to the Project Site.

Equipment, instruments, and materials required to be stored on Site prior to
installation shall be stored in such a manner to avoid damage or exposure to
water, dust, or construction debris.

Repair or replace, at no additional cost to the Owner, all equipment, instruments
and materials that are defective or damaged during installation, to the satisfaction
of the Engineer.

1.08 SITE CONDITIONS

A.

Existing Conditions: per Division 01 General Requirements.

CONTROL SYSTEM EQUIPMENT PANELS AND RACKS

WOODARD & CURRAN 40 67 00-4