Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 11/15/2017 - P361

Finance Committee - Agenda - 11/15/2017 - P361

By dnadmin on Mon, 11/07/2022 - 10:19
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
361
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

Project Number: 228730 WWTE SCADA Upgrades
Issue Date: August 2017 Nashua, NH

1.06 DELIVERY, STORAGE, AND HANDLING

A.

B.

Provide in accordance with Division 01 General Requirements.

Coordinate equipment, instrument, and material delivery to coincide with the
Project schedule. If the delivery schedule of any equipment, instrument, or material
affects the overall Project schedule, notify the Engineer in writing immediately.
Include in the written notification, documentation from the equipment Supplier
indicating the revised delivery schedule and reason for the change.

When applicable, coordinate delivery of equipment, instruments, or materials to be
delivered directly to another trade or vendor for installation in a system or control
panel provided under another Specification section.

Exercise care while loading, unloading and transporting equipment, instruments
and materials to avoid damage. Check all equipment, instruments, and materials for
damage or defects within 7 days of delivery to the Project Site.

Equipment, instruments, and materials required to be stored on Site prior to
installation will be stored in such a manner to avoid damage or exposure to water,
dust, or construction debris.

Repair or replace, at no additional cost to the Owner, equipment, instruments and
materials that are defective or damaged during installation, to the satisfaction of the
Engineer.

1.07. SITE CONDITIONS

A.

Existing Conditions: per Division 01 General Requirements.

PART 2— PRODUCTS (NOT USED)

PART 3 — EXECUTION

3.01 GENERAL

A.

Instruments, SCADA control panels, equipment, and other materials provided, that
come with a manufacturer’s warranty, will have the warranty transferred to the
Owner upon final acceptance.

After installation, provided instruments and SCADA control panels will be
powered up, tested, and witnessed by the Engineer for proper termination and
operation.

After installation, the Contractor shall provide a manufacturer’s representative to
calibrate instruments that require calibration, confirm proper installation, and assist
in startup.

INSTRUMENTATION AND CONTROLS GENERAL REQUIREMENTS

WOODARD & CURRAN 40 61 01-4