Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 11/15/2017 - P359

Finance Committee - Agenda - 11/15/2017 - P359

By dnadmin on Mon, 11/07/2022 - 10:19
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
359
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

Project Number: 228730 WWTE SCADA Upgrades
Issue Date: August 2017 Nashua, NH

C. Shop Drawings

1. Use Transmittal included in Section 01 11 05. The submittal information
for each section shall be contained in a single submission. Incomplete or
partial submissions are not accepted.

2. Index, including equipment, instruments or materials being submitted,
utilizing identification consistent with Contract Documents (equipment
designation, instrument tag number, control panel name, etc.), as well as
proposed, manufacturer, style, model, and part number.

3. For Programmable Logic Controllers (PLC) and Operator Interface
Terminals (OIT) submittals, refer to Section 40 63 43, Programmable Logic
Controllers, for specific requirements.

4. For SCADA control panel Shop Drawing submittals, refer to Section
40 6700, Control System Equipment Panels and Racks, for specific
requirements.
D. Closeout and Maintenance Material Submittals: per Division 01 General
Requirements.
1. Operations and Maintenance (O&M) Materials
a. Include descriptions of equipment, the nature and intended modes

of operation, testing procedures of units in the system, and safety
measures to be taken in operation. Necessary procedures and
methods for effective operation of the system shall be included.

b. Include Record Drawings and instructions necessary for the planned
maintenance of equipment in the system. The O&M Manuals will
incorporate maintenance procedures and schedules, and they will
coordinate and be cross-referenced to detailed operation procedures
provided by the manufacturers.

C. Organize in three-ring binders, provided with labeled dividers,
including a table of contents clearly describing the information
included and order.

d. Include a list of local service departments of authorized distributors
for equipment, instruments, services, and appurtenances. These
service departments should stock the manufacturer’s standard parts
and equipment; provide local service options, etc.

e. For Programmable Logic Controllers (PLC) and Operator Interface
Terminals (OIT) O&Ms, refer to Section 40 63 43, Programmable
Logic Controllers, for specific requirements.

f. For SCADA control panel O& Ms, refer to Section 40 67 00, Process
Control Panels and Hardware, for specific requirements.

INSTRUMENTATION AND CONTROLS GENERAL REQUIREMENTS
WOODARD & CURRAN 40 61 01-2