Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 11/15/2017 - P358

Finance Committee - Agenda - 11/15/2017 - P358

By dnadmin on Mon, 11/07/2022 - 10:19
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
358
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

Project Number: 228730 WWTE SCADA Upgrades
Issue Date: August 2017 Nashua, NH

SECTION 40 61 01
INSTRUMENTATION AND CONTROLS GENERAL REQUIREMENTS
PART 1 —- GENERAL
1.01 SUMMARY
A. Section Includes

1. Provide equipment, instruments, services, appurtenances, and labor as
specified and in the following associated Specifications and as shown on
the Drawings in accordance with this Section.

2. Work by Engineer

a. PLC Programming

b. OIT Programming

C. HMI Programming

d. Integration of new SCADA system
B. Related Requirements

1. Specification 40 63 43 — Programmable Logic Controllers
2. Specification 40 67 00 — Control System Equipment Panels and Racks
1.02 PRICE AND PAYMENT PROCEDURES
A. Measurement and payment requirements: per Division 01 General Requirements.
1.03 ADMINISTRATIVE REQUIREMENTS

A. Coordination, Sequencing, and Scheduling: per Division 01 General Requirements.

1.04 SUBMITTALS
A. Submit in accordance with Division 01 General Requirements.

B. Prior to submittal to the Engineer, Shop Drawings and submittal information will
be thoroughly checked by the Contractor to ensure compliance with Contract
Documents. The Contractor is responsible for verifying that equipment,
instruments, and materials submitted fit within available space and maintain
specified physical clearances, and that equipment is compatible with the operation
of the overall system. Submittal to the Engineer of Shop Drawings and submittal
information certifies that the Contractor has reviewed the information and
requirements have been satisfied.

INSTRUMENTATION AND CONTROLS GENERAL REQUIREMENTS
WOODARD & CURRAN 40 61 01-1