Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 11/15/2017 - P352

Finance Committee - Agenda - 11/15/2017 - P352

By dnadmin on Mon, 11/07/2022 - 10:19
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
352
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

Project Number: 228730 WWTE SCADA Upgrades

Issue Date: August 2017 Nashua, NH
b. Modules shall be labeled in front with room location number.
C. Modules shall be color coded “YELLOW” to match SCADA
cables.

C. Rack Mounted Ethernet Switch

1. Provide one (1) 24 port Managed Industrial CAT6 Ethernet Switches
designed to install in equipment rack assembly. Switch shall be provided
with full complement (24 modules) of CAT6 cable termination modules.
Provide ports as required for installed cables, plus 10% spare. Switch shall
be utilized for the facilities SCADA system.

2. Units shall have connectivity for up to 24 Gigabit ports with integral
fiberoptic termination modules. Units shall be provided in a rugged 19”
rackmount enclosure.

3. Switches shall be suitable for -40C to 85C operating temperature, and also
have dual power inputs options for 18-49VDC or 90-264VAC.

4. Units shall be equal to N-Tron Model #NT24K-AC1, Cisco, Linksys or
approved equal.

5. Modules shall be labeled in front with room location number.
6. Modules shall be color coded “YELLOW” to match SCADA cables.

D. Rack Mounted VPN/Firewall Appliances

1. Provide one (1) VPN/Firewall Appliance to be located in the equipment
rack assembly.
2. Unit shall feature the following:
a. Wide area network (WAN) port and four additional Ethernet-ports.
b. Highly secure real-time control communication
C. Secure routing and firewall capabilities
d. Virtual Private Network (VPN)
e. Intrusion Protection capabilities
f. Network Address Translation (NAT)
g. NBAR protocol filtering
h. Access Control Lists (ACL)

_.

Quality of Services (QOS) for prioritization

COMMUNICATIONS
WOODARD & CURRAN 27 00 00-5

Page Image
Finance Committee - Agenda - 11/15/2017 - P352

Footer menu

  • Contact