Project Number: 228730 WWTE SCADA Upgrades
Issue Date: August 2017 Nashua, NH
SECTION 26 27 26
WIRING DEVICES
PART 1 - GENERAL
1.01 DESCRIPTION OF WORK
A. The Contractor shall provide the labor, tools, equipment, and materials necessary
to furnish and install wiring devices in accordance with the plans and as specified
herein.
B. This section includes the following:
1. Flush Wiring Devices
2. Control Relays
3. Motor Control Relays/Contactors
4. Control Stations
1.02 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and
Supplementary Conditions apply to this section.
B. Related Sections
1. Division 26: Section 26 05 00 COMMON WORK RESULTS FOR
ELECTRICAL
2. Division 26: Section 26 05 19 LOW-VOLTAGE ELECTRICAL POWER
CONDUCTORS AND CABLES
3, Division 26: Section 26 05 26 GROUNDING AND BONDING FOR
ELECTRICAL SYSTEMS
4. Division 26: Section 26 05 34 RACEWAYS, BOXES & SUPPORTING
DEVICES
WIRING DEVICES
WOODARD & CURRAN 26 27 26-1