Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 11/15/2017 - P312

Finance Committee - Agenda - 11/15/2017 - P312

By dnadmin on Mon, 11/07/2022 - 10:19
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
312
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

Project Number: 228730 WWTE SCADA Upgrades
Issue Date: August 2017 Nashua, NH

A.

Prior to all Work of this section, carefully inspect the installed Work of all other
trades and verify that all such Work is complete to the point where this installation
may properly commence.

Field verify all locations and dimensions to ensure that the equipment will be
properly located, readily accessible, and installed in accordance with all pertinent
codes and regulations, the Contract Documents, and the referenced standards.

The Work shall be carefully laid out in advance, and where cutting, drilling, etc.,
of floors, walls, ceilings, or other surfaces is necessary for the proper installation,
this Work shall be carefully done, and any damage to building, piping, or
equipment shall be repaired by skilled mechanics of the trades involved at no
additional cost to the Owner.

In the event any discrepancies are discovered, immediately notify the Owner’s
Representative in writing. Do not proceed with installation in areas of
discrepancy until all such discrepancies have been fully resolved.

3.02 INSTALLATION

A.

Install all equipment and fixtures in complete accordance with the manufacturer’s
recommendations and all pertinent codes and regulations.

Thoroughly inspect all items of equipment and any items dented, scratched, or
otherwise damaged in any manner shall be replaced or repaired and painted to
match original finish. All items so repaired and refinished shall be brought to the
attention of the Engineer for inspection and acceptance.

Coordinate the installation of required supporting devices and sleeves to be set in
poured-in-place concrete or supported from or on other structural components, as
they are constructed.

Sequence, coordinate, and integrate installations of electrical materials and
equipment for efficient flow of the Work. Give particular attention to large
equipment requiring positioning prior to closing in the building and equipment
which must be placed in service before further construction can take place.

Where mounting heights are not detailed or dimensioned, install systems,
materials, and equipment to provide the maximum headroom possible.

The final routing of raceways shall be determined by structural conditions,
interferences with other trades and by terminal locations on apparatus. The
Engineer reserves the right of a reasonable amount of shifting at no extra cost up
until time of roughing in the Work.

Where circuits are shown as “home-runs” all necessary fittings and boxes shall be
provided for a complete raceway installation.

COMMON WORK RESULTS FOR ELECTRICAL

WOODARD & CURRAN 26 05 00-11