Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 11/15/2017 - P309

Finance Committee - Agenda - 11/15/2017 - P309

By dnadmin on Mon, 11/07/2022 - 10:19
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
309
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

Project Number: 228730 WWTE SCADA Upgrades
Issue Date: August 2017 Nashua, NH

1.14

1.15

1.16

A.

The Contractor shall furnish, install, maintain, and remove the temporary
electrical power and lighting systems, including lamps, and pay for all labor,
materials, and equipment required therefore. All such temporary electrical Work
shall meet the requirements of the National Electrical Code, the local utility
company, and OSHA.

The Contractor shall make all necessary arrangements with the local utility
company as to where the temporary electric service can be obtained.

The Contractor shall secure and pay for all required permits and back charges for
Work performed by others, and other expenses incidental to the installation of the
temporary electric service.

POSTED OPERATING INSTRUCTIONS

A.

Provide for each system and principal item of equipment as specified in the
technical sections for use by operation and maintenance personnel. The operating
instructions shall include the following:

1. Wiring diagrams, control diagrams, and control sequence for each
principal system and item of equipment.

2. Start up, proper adjustment, operating, lubrication, and shutdown
procedures.

3. Safety precautions.

4. The procedure in the event of equipment failure.

5. Other items of instruction as recommended by the manufacturer of each

system or item of equipment.

Print or engrave operating instructions and frame under glass or in approved
laminated plastic. Post instructions where directed. For operating instructions
exposed to the weather, provide weather-resistant materials or weatherproof
enclosures. Operating instructions shall not fade when exposed to sunlight and
shall be secured to prevent easy removal or peeling.

MANUFACTURER’S NAMEPLATE

A.

Each item of equipment shall have a nameplate bearing the manufacturer's name,
address, model number, and serial number securely affixed in a conspicuous
place; the nameplate of the distributing agent will not be acceptable.

FIELD FABRICATED NAMEPLATES

A.

Provide laminated plastic nameplates for each equipment enclosure, relay, switch,
and device; as specified in the technical sections or as indicated on the Drawings.

COMMON WORK RESULTS FOR ELECTRICAL

WOODARD & CURRAN 26 05 00-8

Page Image
Finance Committee - Agenda - 11/15/2017 - P309

Footer menu

  • Contact