Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 11/15/2017 - P308

Finance Committee - Agenda - 11/15/2017 - P308

By dnadmin on Mon, 11/07/2022 - 10:19
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
308
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

Project Number: 228730 WWTE SCADA Upgrades
Issue Date: August 2017 Nashua, NH

2. Electricians must wear personal protective equipment while working on
energized systems in accordance with NFPA 70E.

3. Before initiating any work, a job specific work plan must be developed by
the Contractor and the Owner. The work plan must include procedures to
be used on and near the live electrical equipment, barriers to be installed,
safety equipment to be used and exit pathways.

4. Work on energized circuits or equipment cannot begin until prior written
approval is obtained from the Owner.

1.11 SPECIAL WARRANTY

A. Compile and assemble the warranties specified in Division 26 into a separate set
of vinyl covered three ring binders, tabulated and indexed for easy reference.

B. Provide complete warranty information for each item. Information to include:
1. Product or equipment list
2. Date of beginning of warranty or bond
3. Duration of warranty or bond
4. Names, addresses, and telephone numbers and procedures for filing a

claim and obtaining warranty services.
1.12 DEFINITIONS

A. As used in this specification, “provide” means “furnish and install”, “furnish”
means “to purchase and deliver to the project Site complete with every necessary
appurtenance and support and to store in a secure area in accordance with
manufacturers instructions”, and “install” means “to unload at the delivery point
at the Site or retrieve from storage, move to point of installation and perform
every operation necessary to establish secure mounting and correct operation at
the proper location in the Project”.

B. Finished Areas. In general, areas with carpet or tile floors, lay-in or fixed ceiling
tile, special architectural ceiling treatment, or tiled, plastered, or paneled walls
shall be considered finished areas.

C. Interior. For the purposes of this specification, interior is any area within the
boundaries of the foundation of any building within the superstructure or other
structures not classified as a building.

1.13 TEMPORARY POWER

COMMON WORK RESULTS FOR ELECTRICAL
WOODARD & CURRAN 26 05 00-7