Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 11/15/2017 - P306

Finance Committee - Agenda - 11/15/2017 - P306

By dnadmin on Mon, 11/07/2022 - 10:19
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
306
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

Project Number: 228730 WWTE SCADA Upgrades
Issue Date: August 2017 Nashua, NH

2. Coordinate with all local utility companies and make all installations for
their services in accordance with all utility company requirements.

3. Any changes shall be done at the Contractor expense.

4. Where lighting fixtures and other electrical items are shown in conflict
with locations of structural members and mechanical or other equipment,
furnish and install all required supports and wiring to clear the
encroachment for a complete installation.

5. Any Work installed contrary to or without acceptance by the Engineer
shall be subject to change as directed by the Engineer, and no extra
compensation will be allowed to the Contractor for making these changes.

C. Accuracy of Data

1. The Drawings are diagrammatic and functional only, and are not intended
to show exact circuit layouts, number of fittings, components and place in
satisfactory operational power, lighting, and other electrical systems
shown. Install additional circuits, components and material wherever
needed to conform to the specific requirements of the equipment whether
or not indicated or specified.

2. Information and components called for in the specification but not shown
on plans or vise versa shall apply and shall be provided as though required
expressly by both.

3. The locations of equipment, fixtures, outlets and similar devices shown on

the Drawings are approximate only. Field measurements shall take
precedence over scaled dimensions from Drawings. Exact locations shall
be as accepted by Engineer during construction. Obtain in the field all
information relevant to the placing of electrical Work and, in case of any
interference with other Work, proceed as directed by the Engineer and
furnish all labor and materials necessary to complete the Work in an
acceptable manner.

4. In case of difference between building codes, specifications, state laws,
industry standards and the Contract Documents, the most stringent shall
govern. Should the Contractor perform any Work that does not comply
with the requirements of the applicable building codes, state laws, and
industry standards, he shall bear all cost arising in correcting these
deficiencies.

5. Verify size and ratings of motors and other electrically operated devices
supplied by others.

COMMON WORK RESULTS FOR ELECTRICAL
WOODARD & CURRAN 26 05 00-5