Project Number: 228730 WWTE SCADA Upgrades
Issue Date: August 2017 Nashua, NH
C.
Drawings shall identify the specific equipment and material being supplied; the
quantity being supplied; and all accessories, dimensions, descriptions, mounting
and connection details, wiring diagrams, elementary control diagrams, equipment
interface diagrams and any other information necessary to determine compliance
with the plans and specifications. Fabrication and installation shall be in
accordance with the approved Shop Drawings.
As-built copies of all Shop Drawings shall be submitted to the Engineer.
Permits and Easements. Submit copies of reports, permits, and easements
necessary for installation, use, and operation.
Test Reports. Submit copies of reports of tests, inspections, and meter readings as
specified.
1.06 RECORD DRAWINGS
A.
The Contractor shall maintain a complete and separate set of prints of Contract
Drawings and specifications at job Site for duration of the contract. The
Contractor shall record Work completed and all changes from original Contract.
Drawings shall clearly and accurately include Work installed as a modification or
as an addition to the original design.
At completion of Work and prior to final request for payment, the Contractor shall
submit a complete set of reproducible Record Drawings showing all systems as
actually installed.
1.07 JOB CONDITIONS
A.
B.
Existing Conditions
1. Existing Utilities: Locate existing underground utilities in excavation
areas. If utilities are indicated to remain, support and protect services
during excavation operations.
2. Prior to all Work of this section, carefully inspect the installed Work of all
other trades and verify that all such Work is complete to the point where
this installation may properly commence.
3. Verify that the electrical installation may be made in complete accordance
with all pertinent codes and regulations and the original design.
Coordination
1. Coordinate the installation of electrical items with the schedules for Work
of other trades to prevent unnecessary delays in the total Work.
COMMON WORK RESULTS FOR ELECTRICAL
WOODARD & CURRAN 26 05 00-4