Project Number: 228730 WWTE SCADA Upgrades
Issue Date: August 2017 Nashua, NH
4. All utility company and municipal back charges shall be the responsibility
of the Contractor. Cost of electricity shall be borne by the Contractor until
substantial completion as determined by the Owner.
1.03 COORDINATION OF WORK
A.
The electrical work shall be coordinated with the work of other trades to prevent
interferences and so that the progress in construction of the building will in no
way be retarded.
Refer to other sections of these specifications and Drawings for related work
which may affect the work of this section.
Coordinate with all local utility companies and make all installations for their
services in accordance with all utility company requirements.
Where lighting fixtures and other electrical items are shown in conflict with
locations of structural members and mechanical or other equipment, furnish and
install all required supports and wiring to clear the encroachment for a complete
installation.
Any Work installed contrary to or without acceptance by the Engineer shall be
subject to change as directed by the Engineer, and no extra compensation will be
allowed to the Contractor for making these changes.
1.04 DRAWINGS
A.
All electrical equipment such as junction and pull boxes, panelboards, switches,
controls and such other apparatus as may require maintenance and operation from
time to time shall be made easily accessible and properly labeled.
The Contractor shall examine all contracts and reference Drawings, and verify and
properly coordinate the placement of outlets. Contractor shall also check all
Drawings including mechanical Drawings and shop drawings for apparatus for
which he must rough-in and to which he must connect.
1.05 SUBMITTALS
A.
Furnish manufacturer's product data, test reports, and materials certifications as
required.
Follow the procedures specified in the General Requirements and in addition, the
Contractor shall prepare and submit a complete submittal list to the Engineer.
The submittal list shall include all submittal items covered in the Division 26
specification sections.
COMMON WORK RESULTS FOR ELECTRICAL
WOODARD & CURRAN 26 05 00-3