Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 11/15/2017 - P303

Finance Committee - Agenda - 11/15/2017 - P303

By dnadmin on Mon, 11/07/2022 - 10:19
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
303
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

Project Number: 228730 WWTE SCADA Upgrades
Issue Date: August 2017 Nashua, NH

1. Electrical equipment, materials, installation and workmanship shall
comply with all state and local building codes, safety and fire law
regulations at the location of the Work and shall conform to the latest
edition of the applicable codes and standards of the organizations listed:

a. NATIONAL ELECTRICAL CODE (NEC)
b. UNDERWRITERS’ LABORATORIES (UL)

c. INSTITUTE OF ELECTRICAL AND _ ELECTRONICS
ENGINEERS (IEEE C2)

d. AMERICAN NATIONAL STANDARDS INSTITUTE, INC.

(ANSI)

e. NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

f. NATIONAL ELECTRICAL MANUFACTURERS
ASSOCIATION (NEMA).

g. INSULATED POWER CABLE ENGINEERS ASSOCIATION
(IPCEA).

h. ASSOCIATION OF EDISON ILLUMINATING COMPANIES
(AEIC).

i. OCCUPATIONAL SAFETY HEALTH ACT (OSHA).

J. AMERICANS WITH DISABILITIES ACT (ADA).

2. Where the Contract requires the Work or any part of the same, to be above

the standards required by applicable laws, ordinances, rules and
regulations and other statutory provisions pertaining to the Work, such
Work shall be performed and completed in accordance with the Contract
requirements.

3. Should any changes in the specifications and Drawings be necessary to
conform to the requirements of any of the above mentioned codes or
standards, the Contractor shall so notify the Engineer.

B. Drawings required by governing authorities: Prepare any detailed diagrams or
Drawings which may be required by the governing authorities.

C. Permits, Certificates, Inspections, Fees and Utility Costs

1. The Contractor shall obtain and make payments for all permits, licenses,
and certificates which are required for the associated Work.

2. Following completion of the Work, the Contractor shall obtain certificates
of approval from the responsible agencies concerned with the Work.

3. Arrange for timely inspections required for Work under this section.

COMMON WORK RESULTS FOR ELECTRICAL
WOODARD & CURRAN 26 05 00-2

Page Image
Finance Committee - Agenda - 11/15/2017 - P303

Footer menu

  • Contact