Field Order (C-00 63 36)
No.
Date of Issuance: Effective Date:
Project: Owner: Owner's Contract No.:
Contract: Date of Contract:
Contractor: Engineer's Project No.:
Attention:
You are hereby directed to promptly execute this Field Order issued in accordance with the
General Requirements, for minor changes in the Work without changes in Contract Price or
Contract Times. If you consider that a change in Contract Price or Contract Times is required,
please notify the Engineer immediately and before proceeding with this Work.
Reference:
(Specification Section(s)) (Drawing(s) / Detail(s))
Description:
Attachments:
Engineer:
Receipt Acknowledged by Contractor: Date:
Copy to Owner
Based on EJCDC C-942 Field Order
Prepared by the Engineers Joint Contract Documents Committee and endorsed by the Construction Specifications Institute.
Page 1 of 1