Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 11/15/2017 - P277

Finance Committee - Agenda - 11/15/2017 - P277

By dnadmin on Mon, 11/07/2022 - 10:19
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
277
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

Project Number: 228730 WWTE SCADA Upgrades
Issue Date: August 2017 Nashua, NH

PART 3 —- EXECUTION
3.01 GENERAL
A. Project Identification

1. Provide and erect sign(s) at the Project Site to identify the Project and to
indicate the applicable Federal and State Government Agencies that are
participating in the development of the Project.

a. Construct a sign of minimum 3/4-inch exterior grade, high density
overlaid plywood or other approved materia suitable for signs.
b. Provide in accordance with the attached example sketch.
2. Erect the sign in a prominent location as approved by Owner.
3. Do not place, or allow the placement of, other advertising sign boards at the

Project Site or along rights-of-way furnished for the Project Work.

4. Remove the sign when the Work has been completed at no additional cost
to the Owner.

B. Progress Cleaning and Waste Removal

1. Maintain areas free of waste materials, debris, and rubbish and maintain the
Site in a clean and orderly condition.

2. Remove debris and rubbish from spaces and other closed or remote spaces
before enclosing the space.

3. Collect and remove waste materials, debris, and rubbish from Site at least
weekly and legally dispose off-Site.

3.02 OVERALL EXECUTION REQUIREMENTS
A. Coordination

1. Conduct preconstruction and pre-installation meetings before commencing
certain Work that requires coordination or has special requirements or
approvals in accordance with Paragraph 1.03.A above.

2. Coordinate space requirements and installation of Work. Utilize spaces
efficiently to maximize accessibility for other installations, maintenance,
and repairs.

3. Coordinate Work of the various Specifications with interdependent
responsibilities for installing, connecting to, and placing in service,
operating equipment.

OVERALL GENERAL REQUIREMENTS
WOODARD & CURRAN 01 11 05-22

Page Image
Finance Committee - Agenda - 11/15/2017 - P277

Footer menu

  • Contact