Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 11/15/2017 - P276

Finance Committee - Agenda - 11/15/2017 - P276

By dnadmin on Mon, 11/07/2022 - 10:19
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
276
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

Project Number: 228730 WWTE SCADA Upgrades

Issue Date: August 2017 Nashua, NH
B. Transportation and Handling
1. Transport and handle material and equipment in accordance with

manufacturer's instructions.

2. Notify Engineer and Owner in writing upon acceptance of a shipment.

3. Promptly inspect shipments to assure that material and equipment comply
with requirements, quantities are correct, and material and equipment are
undamaged.

4. Furnish equipment and personnel to handle material and equipment by

methods to prevent soiling, disfigurement, or damage.

5. Uncrate equipment and dispose of packing material properly.
C. Storage and Protection
1. Store and protect material and equipment in accordance with manufacturer's

instructions, with seals and labels intact and legible. Store sensitive material
and equipment in weather tight, climate controlled enclosures.

2. For exterior storage of fabricated material and equipment, place on sloped
supports, above ground.

3. Provide for bonded off-Site storage and protection when Site does not
permit on-Site storage or protection.

4. Cover material and equipment subject to deterioration with impervious
sheet covering. Furnish ventilation to avoid condensation or potential
degradation of material and equipment.

5. Furnish equipment and personnel to store material and equipment by
methods to prevent soiling, disfigurement, or damage.

6. Arrange storage of material and equipment to permit access for inspection.
Periodically inspect to assure material and equipment are undamaged and
are maintained in acceptable conditions.

7. After receipt of material and equipment, assume responsibility for loss and
damage including but not limited to breakage, corrosion, weather damage,
and distortion.

OVERALL GENERAL REQUIREMENTS
WOODARD & CURRAN 01 11 05-21

Page Image
Finance Committee - Agenda - 11/15/2017 - P276

Footer menu

  • Contact