Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 11/15/2017 - P274

Finance Committee - Agenda - 11/15/2017 - P274

By dnadmin on Mon, 11/07/2022 - 10:19
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
274
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

Project Number: 228730 WWTE SCADA Upgrades
Issue Date: August 2017 Nashua, NH

3. Take Samples in accordance with the requirements specified in the Contract
Documents, as selected by Owner or independent testing agency. Furnish
and ship at no additional cost to Owner.

C. Factory Testing

1. Provide 14 days prior written notice of factory inspections and tests to
Owner and Engineer.

2. If failure to give proper written notice results in material and equipment
being assembled or covered before a factory inspection or test, make
material and equipment ready for inspection or test and reassemble or
recover at no additional cost to Owner.

3. Owner may inspect any portion of material and equipment furnished at any
reasonable time during manufacture and may witness testing of any portion
of material and equipment wherever located. Owner and Engineer to
witness tests only.

4. Furnish, set up and operate test equipment and facilities.

5. If facilities for conducting required tests are unavailable to the
manufacturer, conduct tests elsewhere or have them performed by an
independent agency approved by Owner.

6. Protect material and equipment after testing and checking to provide that
subsequent testing of other equipment or systems does not disturb, damage
or otherwise interfere with functional capability of material and equipment.

7. Assume responsibility for protection of material and equipment and safety
of all personnel during factory testing program.

8. Grounds for rejection: failure to withstand tests; failure to meet ratings;
failure to meet applicable standards.

9. In the event of failure

a. Submit revisions of documents requiring approval for changes
required for rectification.

b. Obtain Owner's and Engineer’s approval before making such
changes.

C. Provide written details of any changes to be made not requiring
approval.

d. Notify Owner and Engineer in writing before retesting.

OVERALL GENERAL REQUIREMENTS
WOODARD & CURRAN 01 11 05-19

Page Image
Finance Committee - Agenda - 11/15/2017 - P274

Footer menu

  • Contact