Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 11/15/2017 - P268

Finance Committee - Agenda - 11/15/2017 - P268

By dnadmin on Mon, 11/07/2022 - 10:19
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
268
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

Project Number: 228730
Issue Date: August 2017

WWTE SCADA Upgrades
Nashua, NH

Engineer will advise Contractor in writing of any negative
determination. Engineer will record Engineer’s costs in evaluating
a substitute proposed or submitted by Contractor. Whether or not
Engineer approves a substitute so proposed or submitted by
Contractor, Contractor shall reimburse Owner for the reasonable
charges of Engineer for evaluating each such proposed substitute.
Contractor shall also reimburse Owner for the reasonable charges of
Engineer for making changes in the Contract Documents (or in the
provisions of any other direct contract with Owner) resulting from
the acceptance of each proposed substitute.

7. Manufacturers' Installation Instructions and Certificates: Submit 2 prints

and electronic files PDF format by email of printed instructions for delivery,
storage, assembly, installation, start-up, adjusting, and finishing. Indicate
special procedures, perimeter conditions requiring special attention and
special environmental criteria required for application or installation.

a.

Submit manufacturers’ certificates for recent or previous test results
on material or equipment, but they must be acceptable to Engineer
and Owner. Indicate material or equipment conforms to or exceeds
specified requirements and provide supporting reference date,
affidavits, and certifications as appropriate.

Submit test results, data, and reports and certifications to Engineer
based on tests performed. Submit test reports and certifications for
independent testing services specified.

8. Record Documents and Closeout Submittals: Submit record documents

described in Paragraph 3.05.D. below and per Paragraph 1.03.D below.

a.

WOODARD & CURRAN

As-Builts for Material and Equipment: Submit submit 2 prints and
electronic files PDF format by email.. Indicate "As-Supplied" in
revision block and sign. Show all changes and revisions to Final
Completion per Paragraph 3.05.D.

Conformed to Construction Record Drawings: Submit 2 prints and
electronic files in .DWG format and PDF format on CD or USB
flash drive for Engineer’s use in preparing final Record Drawings.
Indicate "Conformed by Contractor to Construction Records" in
revision block and sign. Show all changes and revisions to Final
Completion per Paragraph 3.05.D.

Warranties and Guarantees: Submit duplicate notarized copies of
warranty documents which are executed and transferable from
Subcontractors, Suppliers, and manufacturers. For items of Work
delayed beyond date of Substantial Completion, provide updated
submittal within 10 days after acceptance, listing date of acceptance
as start of Warranty Period. Assemble in three ring binders with
durable plastic cover with a table of contents.

OVERALL GENERAL REQUIREMENTS
01 11 05-13

Page Image
Finance Committee - Agenda - 11/15/2017 - P268

Footer menu

  • Contact