  2. Finance Committee - Agenda - 11/15/2017 - P267

Finance Committee - Agenda - 11/15/2017 - P267

By dnadmin on Mon, 11/07/2022 - 10:19
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
267
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

Project Number: 228730
Issue Date: August 2017

WOODARD & CURRAN

1)

2)

WWTE SCADA Upgrades
Nashua, NH

if in the exercise of reasonable judgment Engineer
determines that it is at least equal in materials of
construction, quality, durability, appearance, strength, and
design characteristics; it will reliably perform at least equally
well the function and achieve the results imposed by the
design concept of the completed Project as a functioning
whole; and it has a proven record of performance and
availability of responsive service; and

Contractor certifies that, if approved and incorporated into
the Work there will be no increase in cost to the Owner or
increase in Contract Times and it will conform substantially
to the detailed requirements of the item named in the
Contract Documents.

Substitute Items: If in Engineer’s sole discretion an item of material
or equipment proposed by Contractor does not qualify as an “or-
equal” item subparagraph 6.a above, it will be considered a proposed
substitute item. Contractor shall submit sufficient information as
provided below to allow Engineer to determine if the item of
material or equipment proposed is essentially equivalent to that
named and an acceptable substitute therefor. Requests for review of
proposed substitute items of material or equipment will not be
accepted by Engineer from anyone other than Contractor.

1)

2)

3)

Contractor shall certify that the proposed substitute item will
perform adequately the functions and achieve the results
called for by the general design, be similar in substance to
that specified, and be suited to the same use as that specified.

Contractor shall state the extent, if any, to which the use of
the proposed substitute item will prejudice Contractor’s
achievement of Substantial Completion on time, whether use
of the proposed substitute item in the Work will require a
change in any of the Contract Documents (or in the
provisions of any other direct contract with Owner for other
work on the Project) to adapt the design to the proposed
substitute item, and whether incorporation or use of the
proposed substitute item in connection with the Work is
subject to payment of any license fee or royalty.

Contractor shall identify all variations of the proposed
substitute item from that specified, available Engineering,
sales, maintenance, repair, and replacement services; and
shall contain an itemized estimate of all costs or credits that
will result directly or indirectly from use of such substitute
item, including costs of redesign and claims of other
contractors affected by any resulting change.

OVERALL GENERAL REQUIREMENTS
01 11 05-12

Page Image
Finance Committee - Agenda - 11/15/2017 - P267