Project Number: 228730
Issue Date: August 2017
WOODARD & CURRAN
2)
3)
4)
WWTE SCADA Upgrades
Nashua, NH
determined and verified all field measurements, quantities,
dimensions, specified performance and design criteria,
installation requirements, materials, catalog numbers, and
similar information with respect thereto;
determined and verified the suitability of all materials
offered with respect to the indicated application, fabrication,
shipping, handling, storage, assembly, and installation
pertaining to the performance of the Work; and
determined and verified all information relative to
Contractor’s responsibilities for means, methods,
techniques, sequences, and procedures of construction, and
safety precautions and programs incident thereto.
Each submittal shall bear a stamp or specific written certification
that Contractor has satisfied Contractor’s obligations under the
Contract Documents with respect to Contractor’s review and
approval of that submittal.
Engineer’s Review
1)
2)
3)
Engineer will provide timely review of Shop Drawings and
Samples in accordance with the Schedule of Submittals
acceptable to Engineer. Engineer’s review and approval will
be only to determine if the items covered by the submittals
will, after installation or incorporation in the Work, conform
to the information given in the Contract Documents and be
compatible with the design concept of the completed Project
as a functioning whole as indicated by the Contract
Documents.
Engineer’s review and approval will not extend to means,
methods, techniques, sequences, or procedures of
construction (except where a particular means, method,
technique, sequence, or procedure of construction is
specifically and expressly called for by the Contract
Documents) or to safety precautions or programs incident
thereto. The review and approval of a separate item as such
will not indicate approval of the assembly in which the item
functions.
Engineer’s review and approval shall not relieve Contractor
from responsibility for any variation from the requirements
of the Contract Documents unless Contractor has complied
with the requirements of subparagraph C.6. below.
Engineer’s review and approval shall not relieve Contractor
from errors or omissions in a Shop Drawing or Sample.
OVERALL GENERAL REQUIREMENTS
01 11 05-10