Project Number: 228730
Issue Date: August 2017
WWTE SCADA Upgrades
Nashua, NH
2) Photograph construction progress and submit monthly with
Payment Application during progress of Work.
3) Photograph all areas of the Project Site to document final
conditions and submit with Application for Final aPayment.
b. Submit a copy of photographs to the Engineer for review of quality.
Once approved, submit 2 copies of photographs. Re-take any
photograph furnished which, in the opinion of the Engineer, is of
poor quality or incomplete at no additional cost to Owner.
C. Submittal Procedures
1.
Schedule submittals to expedite the Project and coordinate with schedules
required by Paragraph 1.03.B above. Deliver each submittal in the quantity
indicated to Engineer (with copy to Owner where required) as follows..
Coordinate submission of related items.
Engineer:
Woodard & Curran, Inc.
980 Washington St, Suite 325
Dedham, MA 02026-6797
Attention: Robert Davis,
Telephone: (781) 613-0641
Email: rdavis@woodardcurran.com
Owner:
Nashua Wastewater Department
2 Sawmill Rd.
Nashua, NH 03060
Attention: William Keating, P.E., Project Manager
Email: KeatingW@nashuanh.gov
Present submittals in a clear and thorough manner, in English and using
English units. Use sheet size of not less than 8 1/2 by 11 inches and not
more than 24 by 36 inches. Provide space for Contractor, Engineer, and
Owner's review stamps.
Revise and resubmit documents as required. Identify all changes made
since previous submittal. Distribute copies of reviewed submittals to
concerned parties. Instruct parties to promptly report any inability to
comply with provisions. Submittals not requested on the submittal schedule
may not be recognized or processed.
OVERALL GENERAL REQUIREMENTS
WOODARD & CURRAN 01 11 05-8