Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 11/15/2017 - P254

Finance Committee - Agenda - 11/15/2017 - P254

By dnadmin on Mon, 11/07/2022 - 10:19
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
254
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

Project Number: 228730

WWTE SCADA Upgrades

Issue Date: August, 2017 Nashua, NH

SECTION 01 11 00

SUMMARY OF WORK
PART 1 —- GENERAL
1.01 SECTION INCLUDES
A. Project Description
B. Description of the Work
C. Coordination and Sequencing

1.02 PROJECT DESCRIPTION

A.

The Work is located at the wastewater treatment facility in the main process
building and in various ancillary equipment buildings near the main process
building. The Work generally consists of varying degrees of electrical,
instrumentation, and controls upgrades associated with the SCADA system that
supports the wastewater systems in the City; and all materials and equipment,
services and construction inherent to the Work.

1.03 DESCRIPTION OF THE WORK

A.

The Work includes labor, materials, equipment, and services required for
construction, testing, and commissioning of the Project in accordance with the
Contract Documents and as more specifically described in the Specifications and
Drawings. It includes, but is not limited to, the following principal features:

1.

Process Building: Demolition of consoles, leveling of associated floor
surfaces, installation of new programmable logic controllers, Ethernet
switches, Ethernet input/output cards, computers, and Operator Interface
Terminals. Installation of entire new control panels. Installation of new
network hardware in server room. Installation of new conduit runs to allow
replacement of existing fiber optic network switch and securing of new
connection in server room. Software will be upgraded by the Contractor and
all necessary devices will be reprogrammed by Engineer.

Ancillary Buildings: Demolition of consoles, leveling of associated floor
surfaces, installation of new programmable logic controllers, Ethernet
switches, Ethernet input/output cards, computers, and Operator Interface
Terminals. Installation of entire new control panels.

SUMMARY OF WORK

WOODARD & CURRAN 01 11 00-1