4.
5.
6.
C-2.6
Participation in group insurance plans which may be available to employees of the
Owner;
Participation or contributions by either the Contractor or the Owner to the public
employees retirement system;
Accumulation of vacation leave or sick leave provided by the Owner;
Unemployment compensation coverage provided by the Owner.
Contractor will provide the Owner with certificates of insurance for coverage, as listed, and
endorsements affecting coverage required by the Agreement. The Owner requires thirty days
written notice of cancellation or material change in coverage. The certificates and endorsements
for each insurance policy must be signed by a person authorized by the insurer and who is
licensed by the State of New Hampshire. General Liability and Auto Liability policies must
name the City of Nashua and Engineer as additional insureds and reflect on the certificate of
insurance. Contractor is responsible for filing updated certificates of insurance with the City of
Nashua's Risk Management Department during the life of the contract.
>
All deductibles and self-insured retentions shall be fully disclosed in the certificate(s) of
insurance.
If aggregate limits of less than $2,000,000 are imposed on bodily injury and property
damage, Contractor must maintain umbrella liability insurance of at least $1,000,000. All
aggregates must be fully disclosed on the required certificate of insurance.
The specified insurance requirements do not relieve Contractor of its responsibilities or
limit the amount of its liability to the Owner or other persons, and Contractor is
encouraged to purchase such additional insurance, as it deems necessary.
The insurance provided herein is primary, and no insurance held or owned by Owner
shall be called upon to contribute to a loss.
Contractor is responsible for and required to remedy all damage or loss to any property,
including property of the Owner, caused in whole or part by Contractor or anyone
employed, directed, or supervised by Contractor.
SC-33 Authority of the Engineer
In Paragraph 33.1, DELETE the first and second sentences in their entirety.
In Paragraph 33.2, in the third line, DELETE “to suspend any work that is being improperly
performed,”.
13089A