Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 11/15/2017 - P245

Finance Committee - Agenda - 11/15/2017 - P245

By dnadmin on Mon, 11/07/2022 - 10:19
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
245
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

C-2.2
SC-2 Definitions
ADD the following to the definition of Engineer.
The Engineer is Woodard & Curran, Inc. which has designed the Project, which 1s to act
as Owner’s representative, assume all duties and responsibilities, and have the rights and
authority assigned to Engineer in the Contract Documents in connection with the
completion of the Work in accordance with the Contract Documents.

Add the following new definition.

“General Requirements” — Sections of the Specifications in Division 01 (numbered
beginning with 01) that apply to all the Specifications and Drawings.

SC-7 Inspection and Testing of Materials

REPLACE the text of paragraphs 7.1 through and including 7. 6 with “NOT USED” and
maintain paragraph numbering.

SC-10 Surveys

REPLACE paragraph 10. with “10. Surveys - NOT USED” and DELETE subparagraphs 10.1
through and including 10.4 in their entirety.

SC-16 Superintendence by the Contractor
In the third sentence, REPLACE “to the Engineer” with “to the Owner”.
SC-17 Extra Work and Change Orders

In Paragraph 17.1, first line, INSERT “or Owner” after “Engineer”. In subparagraph c.,
DELETE “by the Engineer”.

In Paragraph 17.2, first line, replace “Engineer” with “price”.
Add the following:
17.5 See General Requirements.

SC-19 Defective Work: In 19.1, second line, replace “condemned” with “determined”.

13089A

Page Image
Finance Committee - Agenda - 11/15/2017 - P245

Footer menu

  • Contact