Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 11/15/2017 - P238

Finance Committee - Agenda - 11/15/2017 - P238

By dnadmin on Mon, 11/07/2022 - 10:19
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
238
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

A8.

49,
50.
51.
52.

53.
54.

C-1.29

47.3. The Engineer, upon request of the Owner and agreement by the Contractor, will
make an inspection of the complete part of the work to confirm its status of completion.

47.4 Consent of the surety and endorsement of the insurance carrier must be obtained
prior to use and/or occupancy by the Owner. Also, prior to occupancy, the Owner will
secure the required insurance coverage on the building.

47.5. The Owner will have the right to exclude the Contractor from the subject portion
of the project after the date of occupancy but will allow the Contractor reasonable access
to complete or correct items.

47.6 The warranty period shall begin upon substantial completion.

Suspension of Work. The Owner may, at any time and without cause, suspend the work
or any portion thereof for a period of not more than 90 days by notice in writing to the
Contractor and the Engineer. The Owner shall fix the date on which work shall be
resumed. The Contractor will be allowed an increase in the contract price or an extension
of the contract time, or both, directly attributable to any suspension if he makes a claim
therefore as provided in articles 17 and 21.

[Reserved]
[Reserved]
[Reserved]

Project Sign. Furnish and erect a sign at the project site to identify the project and to
indicate that the State Government is participating in the development of the project.
Place the sign in a prominent location as directed by the Engineer. Do not place or allow
the placement of other advertising signboards at the project site or along rights-of-way
furnished for the project work. See Exhibit 1 for details of construction.

[Reserved]
Public Convenience and Traffic Control requirements:

54.1 The Contractor shall at all times so conduct his work as to assure minimal
obstruction to traffic. The safety and convenience of the general public and the residents
along the work site route and the protection of property shall be provided for by the
Contractor. The Contractor shall be responsible for timely notification to local residents
before causing any interruptions of their access.

54.2 Fire hydrants and water holes for fire protection on or adjacent to the work site
shall be kept accessible to fire apparatus at all times, and no obstructions shall be placed
within 10 feet of any such facility. No footways, gutters, drain inlets, or portions of
highways adjoining the work site shall be obstructed. In the event that all or part of a
roadway is officially closed to traffic during construction, the Contractor shall provide
and maintain safe and adequate traffic accessibility, satisfactory to the Engineer, for
residences and businesses along and adjacent to the roadway so closed.