Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 11/15/2017 - P220

Finance Committee - Agenda - 11/15/2017 - P220

By dnadmin on Mon, 11/07/2022 - 10:19
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
220
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

11.

12.

13.

C-1.11

Contractor's Obligations are as follows: The Contractor shall and in good workmanlike
manner, do and perform all work and furnish and pay for all supplies and materials,
machinery, equipment, facilities and means, except as herein otherwise expressly
specified, necessary or proper to perform and complete all the work required by this
contract, within the time stated in the proposal in accordance with the plans and drawings
covered by this contract, and any and all supplemental plans and drawings, in accordance
with the directions of the Engineer as given from time to time during the progress of the
work, whether or not he considers the direction in accordance with the terms of the
contract. He shall furnish, erect, maintain and remove such construction plant and such
temporary works as may be required. The Contractor shall observe, comply with, and be
subject to all terms, conditions, requirements, and limitations of the contract documents,
and shall do, carry on and complete the entire work to the satisfaction of the Engineer and
Owner.

Contractor shall carry on the work and adhere to the progress schedule during all
disputes, disagreements or unresolved claims with the Owner. No work shall be delayed
or postponed pending the resolution of any disputes, disagreements, or claims except as
the Owner and Contractor may otherwise agree in writing.

Weather Conditions. In the event of temporary suspension of work, or during inclement
weather, or whenever the Engineer shall direct, the Contractor and his Subcontractors
shall protect their work and materials against damage or injury from the weather. If, in
the opinion of the Engineer, any work or material shall have been damaged or injured by
reason of failure on the part of the Contractor or any of his Subcontractors to so protect
his work, such materials shall be removed and replaced at the expense of the Contractor.

Protection of Work and Property shall be provided as follows:

13.1. The Contractor shall at all times safely guard the Owner's property from injury or
loss in connection with this contract. He shall at all times safely guard and protect his
own work, and that of adjacent property, from damage. The Contractor shall replace or
make good any such damage, loss or injury unless caused directly by errors contained in
the contract, or by the Owner, or his authorized representatives. The Contractor will
notify owners of adjacent utilities when prosecution of the Work may affect them.

13.2 The Contractor shall take all necessary precautions for the safety of employees on
the work site, and shall comply with all applicable provisions of federal, state and
municipal safety laws and building codes to prevent accidents or injury to persons on,
about or adjacent to the premises where the work is being performed. He shall erect and
properly maintain at all times, as required by the conditions and progress of the work, all
necessary safeguards for the protection of the workmen and the public and shall post
danger signs warning against the hazards created by such features of construction as
protruding nails, hoists, well holes, elevator hatchways, scaffolding, window openings,
stairways, trenches and other excavations, and falling materials, and he shall designate a
responsible member of his organization on the work, whose duty shall be the prevention
of accidents. The name and position of any person so designated shall be reported to the

Page Image