Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 11/15/2017 - P215

Finance Committee - Agenda - 11/15/2017 - P215

By dnadmin on Mon, 11/07/2022 - 10:18
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
215
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

C-1.6

drawings and for their conformity to the plans and specifications. The Contractor shall
notify the Engineer in writing of any deviations at the time he furnishes such drawings.
He shall remain responsible for the accuracy of the drawings showing the deviations but
not for the acceptance of the deviations from the original design shown in the plans and
specification. Approval by the Engineer and the Owner of any deviation in material,
workmanship or equipment proposed subsequent to approval of the shop drawings or
design data, shall be requested in writing by the Contractor.

4.5 When submitted for the Engineer's review, Shop Drawings shall bear the
Contractor's certification that he has reviewed, checked and approved the Shop Drawings
and that they are in conformance with the requirements of the Contract Documents.

Materials, Services, Facilities and Workmanship shall be furnished as follows:

5.1 Except as otherwise specifically stated in the contract documents, the Contractor
shall provide and pay for all materials, labor, tools, equipment, water, light, power,
transportation, superintendence, temporary construction of every nature, and all other
services and facilities of every nature whatsoever necessary to execute, complete, and
deliver the work within the specified time.

5.2. Unless otherwise specifically provided for in the specifications, all workmanship,
equipment, materials and articles incorporated in the work shall be new and the best
grade of the respective kinds for the purpose.

5.3 The Contractor shall furnish to the Engineer for approval the manufacturer's
detailed specifications for all machinery, mechanical and other special equipment, which
he contemplates installing together with full information as to type, performance
characteristics, and all other pertinent information as required.

5.4. Materials which are specified by reference to the number or symbol of a specific
standard, such as an ASTM standard, a federal specification or other similar standard,
shall comply with requirements in the latest revision thereof and any amendment or
supplement thereto in effect on the date of the advertisement for bids, except as limited to
type, class or grade, or modified in such reference. The standards referred to shall have
full force and effect as though printed therein.

5.5 For equipment or for materials, when requested by the Engineer, the Contractor
shall submit certificates of compliance from the manufacturer, certifying that the
equipment or the materials comply with the requirements of the specifications or the
standards.

5.6 Manufactured articles, materials, and equipment shall be applied, installed,
connected, erected, used, cleaned and conditioned as directed by the manufacturer.

5.7. Materials, supplies, and equipment shall be in accordance with samples submitted
by the Contractor and approved by the Engineer.

Page Image
Finance Committee - Agenda - 11/15/2017 - P215

Footer menu

  • Contact