Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 11/15/2017 - P213

Finance Committee - Agenda - 11/15/2017 - P213

By dnadmin on Mon, 11/07/2022 - 10:18
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
213
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

C-1.4

2.11 “Drawings” mean the part of the Contract Documents which show the
characteristics and scope of the work to be performed and which have been prepared or
approved by the Engineer.

2.12 “Engineer” means the person, firm or corporation named as such in the contract
documents.

2.13. “Field order” means a written order effecting a change in the work not relating to
an adjustment in the contract price or an extension of the contract time and issued by the
Engineer to the Contractor during construction.

2.14 “Notice of Award” means the written notice of the acceptance of the Bid from the
Owner to the successful Bidder.

2.15 “Notice to Proceed” means the written communication issued by the Owner to the
Contractor authorizing him to proceed with the Work and establishing the date of
commencement of the Work.

2.16 “Owner” means a public or quasi-public body or authority, corporation,
association, partnership, or individual for whom the work is to be performed.

2.17 “Plans” means the contract drawings or exact reproductions thereof which show
the scope, character, dimensions and details of the work and which have been prepared or
approved by the Engineer.

2.18 “Project” means the undertaking to be performed as provided in the Contract
Documents.

2.19 “Resident Project Representative” means the authorized representative of the
Owner who is assigned to the Project site or any part thereof.

2.20 “Shop Drawings” means all drawings, diagrams, illustrations, brochures,
schedules and other data which are prepared by the Contractor, a Subcontractor,
manufacturer, supplier or distributor, which illustrates how specific portions of the Work
shall be fabricated or installed.

2.21 “Special conditions” means revisions or additions to these general conditions,
Supplemental General Conditions or specifications applicable to an individual project.

2.22 “Specifications” means a part of the contract documents consisting of written
descriptions of a technical nature of materials, equipment, construction systems,
standards and workmanship.

2.23 “Subcontractor” means an individual, firm or corporation having a direct contract
with the Contractor or with any other Subcontractor for the performance of a part of the
Work at the site.

2.24 “Substantial Completion” means that date as certified by the Engineer when the
construction of the Project or a specified part thereof is sufficiently completed, in