Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 11/15/2017 - P176

Finance Committee - Agenda - 11/15/2017 - P176

By dnadmin on Mon, 11/07/2022 - 10:18
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
176
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

UW

22x34 SHEET
1:0.94614

SO0002.dwg, Sep 27, 2017 — 3:35pm

| ucturel\ 228730

\\woodardcurran.net\shared\Projects\228730 Nashua Wastewater\wip \Drawings\

| EQUIPMENT-SIZE PER VENDOR

4” MIN
APPLY EPOXY BONDING ANCHOR ROD LOCATION, | (UNO)
COMPOUND TO EXISTING SIZE, AND QUANTITY PER
CONCRETE VENDOR’S EQUIPMENT
] DRAWINGS
/
3/4” CHAMFER [- #4 @ 12” OCEW 4° (TYP) #4 @ 12” OC DOWELS
ALL SIDES . DRILL & EPOXY W/
- ] 1 1/2” CLR FI 4” MIN EMBEDMENT
° J
° ° ° ° ° » FLOOR SLAB
t 2° GlR , SEE PLANS
FLOOR SLAB REINF
NOT SHOWN | TOP SLAB EL
NY | | SEE PLANS
NY QS
LY ROMA LYROAA OMYYAA
YOY SSAYOY WOY’AY
RR RR RY

NOTES:

1. SEE ELECTRICAL DRAWINGS FOR EQUIPMENT LOCATIONS, QUANTITIES, AND LAYOUT

TOP OF PAD SHALL BE LEVEL WITHIN 1/8—INCH

on FP YF WN

REBAR: ASTM A615, GRADE 60 REINFORCING BARS

CONCRETE: 3,000 PSI CONCRETE WITH MAXIMUM W/C RATIO = 0.55

ELECTRICAL EQUIPMENT PADS SHALL BE 4” THICK, UNLESS NOTED OTHERWISE

/322\ INTERIOR EQUIP PAD

\E—XXX/ SCALE: NTS

PAD SHALL PROJECT A MINIMUM OF 4—INCH BEYOND MECHANICAL EQUIPMENT FOOTPRINT.

PROVIDE SACK—RUBBED FINISH TO ALL EXPOSED SIDES OF EQUIPMENT PAD AND A TROWEL FINISH TO THE TOP SURFACE

PRIOR TO EQUIPMENT INSTALLATION, APPLY CURE AND SEAL COMPOUND TO EQUIPMENT PAD SURFACES

800.426.4262 | www.woodardcurran.com
COMMITMENT & INTEGRITY DRIVE RESULTS

41 Hutchins Drive
Portland, Maine 04102

WOODARD
&CURRAN

THIS DOCUMENT IS THE PROPERTY OF WOODARD & CURRAN INC. AND ITS CLIENT.
REPRODUCTION OR MODIFICATION WITHOUT WRITTEN PERMISSION IS PROHIBITED.

a
j ~~

#
#
#
#
#
9/28/17
DATE

CHECKED BY: RUD
228730_S0002.DWG

RELEASED FOR BID ADDENDUM NO.3
DESCRIPTION

DESIGNED BY: SMH

#
#
#
it
#
0
REV

SMH

DRAWN BY:

CONCRETE EQUIPMENT PAD
INSTALLATION DETAILS

CITY OF NASHUA, NH
WASTEWATER TREATMENT FACILITY
SCADA SYSTEM UPGRADE

JOB NO.: 228730

DATE: SEPTEMBER 2017

SCALE: AS NOTED

SHEET: 1 OF 1

9-0002

ue

Page Image
Finance Committee - Agenda - 11/15/2017 - P176

Footer menu

  • Contact