Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 11/15/2017 - P174

Finance Committee - Agenda - 11/15/2017 - P174

By dnadmin on Mon, 11/07/2022 - 10:18
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
174
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

1 2

22x34 SHEET
1:0.94963

ite Plans\DRAWINGS\E—007.dwg, Sep 27, 2017 — 3:37pm

(OO
\\woodardcurran.net\shared\Projects\228730 Nashua Wastewater\wip \Drawings\

GENERAL NOTES:

1.

THIS DRAWING IS A COMPILATION OF THE FOLLOWING RECORD DRAWING SETS:

1985 CDM UPGRADE SHT E-9, E-—27 & E-—30

1998 S&W DIGESTER ELECTRICAL SITE PLAN SHT E-3, E-6, E-10, E-11 & E-13
1999 S&W EMERGENCY GENERATOR UPGRADE SHT E-2

2006 M&E WET WEATHER SITE PLAN SHT E-2, E-5 & E-9

e 2015 W&C AERATION UPGRADE SHT E-3

THE CONTRACTOR SHALL FIELD VERIFY ROUTING IDENTIFIED ON THE CONTRACT
DRAWINGS

REFER TO NETWORK ARCHITECTURE DRAWING FOR FIBER AND COMMUNICATION
INTERCONNECTIONS BETWEEN CONTROL PANELS AND FIBER TERMINATION POINTS.
THE CONTRACTOR SHALL INSPECT BELOW GRADE CONDUITS IDENTIFIED FOR RE-USE
TO ENSURE CONDUIT INTEGRITY IS NOT COMPROMISED. THE CONTRACTOR SHALL
REVIEW WITH ENGINEER AND OWNER ANY LOCATIONS WHERE CONDUITS ARE NOT
CAPABLE OF RE-USE. REPLACEMENT OF BELOW GRADE CONDUIT SHALL BE
EXCLUDED FROM THE SCOPE OF THIS PROJECT.

THE CONTRACTOR SHALL RE-USE CONDUITS WHERE POSSIBLE.

FOR PURPOSES OF ESTIMATING FIBER OPTIC CONDUIT LENGTHS, THE SCALE OF THIS

DRAWING IS 3” = 1’

KEYED NOTES:

©

IDENTIFY EACH FIBER OR ETHERNET CABLE “LEG” THAT NEEDS TO BE DEMO’D
AND REPLACED.

CP—30

CP-60

<» CATS FROM PLC-5

EHH-7S

TO DECHLOR
(TO BE CONFIRMED)

co—

EHH—5S
EHH-11S |
|
fi |
T\_
> CP—40
PLC—4
I
|
! oy} CP—31
kK EHH-108 _ }
IMH #1-2 EHH— 3s I
—_— EHH—4S
NN EHH—4P
cP-21 SET
Io EHH—14S
'e J CP—200
NO FLOOR-
Te PLC-1B EHH—13S
EHH—1P 1ST FLOOR = __¥
EXISTING FIBER
He BATCH PANEL
FIRST FLOOR
EXACT ROUTE &
MEDIA (CAT5/F.O.)
TO PLC6 TBD EXISTING
aa nic
cP-100
ie PLC-1
2ND FLOOR FO
<> TERMINATION
cS PANEL
CP—600 :
PLC-6
NEW FIBER
SWITCH LOCATION” {J
2ND FLOOR
(PROPOSED) F.0. TO MAIN
oOo \L SWITCH EXACT
ROUTE TBD.
cp-700 ——I] » \
PLC—7 = TLCP1 \
TLCP2 cP~ 800
j= UNDERGROUND PLC 1-A
DUCTBANK

a
|
|
|
\

: o,

POTENTIAL
FIBER ROUTES

CP-78 = >

PRIMARY GALLERY
a

CP—801

40

oo

60
SCALE IN FEET

CP—50

,
—

or
[L—

OLD PLC—5S PANEL

PULL BOX

EMH—#5

IPBx— #4
ee

[-#— EMH—#4
|
}

LIST OF ABBREVIATIONS:

CP CONTROL PANEL

EHH ELECTRICAL HAND HOLE

EMH ELECTRICAL MAN HOLE

IMH INSTRUMENTATION MAN HOLE
IPBx INSTRUMENTATION PULL BOX

wn
a
>
E D
3° Lu
Slo
ce
oO
3s a
3 E&
Oo
°
a 3 a
= -
=
oz: 2
o
2 oO 3
—_ —
Qa = -
oN =
2s 0 lu
= N —
S—es 5
5 oS =
fee §
Sas Oo
AZ
oe
aw
OD
Q5

THIS DOCUMENT IS THE PROPERTY OF WOODARD & CURRAN INC. AND ITS CLIENT.
REPRODUCTION OR MODIFICATION WITHOUT WRITTEN PERMISSION IS PROHIBITED.

CHECKED BY: CG
E-007.dwg

m
So
Zz
=
Alz
2|0O
aie
Ole
elx
a
a
—= | ul
a10
oO
Oo
LL
a
Lil
nn
<t
Lu
—
Lu
ow

0

DESIGNED BY: CG

SA

DRAWN BY:

FIBER OPTIC
SITE PLAN

CITY OF NASHUA, NH
WASTEWATER TREATMENT FACILITY
SCADA SYSTEM UPGRADE

JOB NO.: 228730

DATE: SEPTEMBER 2017

SCALE: 1/32” = 1’

SHEET: 2 OF 2

E-007

Page Image
Finance Committee - Agenda - 11/15/2017 - P174

Footer menu

  • Contact