DEMOLITION
DEMOLITION KEYED NOTES:
1. REMOVE OPERATOR INTERFACE TERMINAL FROM CONSOLE AND INSTALL ON CP—150
AS DESIGNED. DEMOLISH CONSOLE AND ALL ATTACHED ITEMS.
2. REMOVE OMEGA LVCN CONDUCTANCE SENSING RELAY FROM SCRUBBER PANEL AND
INSTALL IN CP—150, RECONNECT PROBE EXISTING FIELD WIRING.
3. DEMOLISH: EXISTING SCADA PANEL, FIBER OPTIC SWITCH PANEL, JUNCTION PANELS,
SCRUBBER PANEL, POLYMER PANEL AND CONSOLE.
GENERAL NOTES:
1. DEMOLISH ANY UNNECESSARY LIVE CIRCUITS COMPLETE TO SOURCE. TAG AND
RE—ROUTE ANY CIRCUITS THAT MUST REMAIN ACTIVE.
2. AS ALTERNATE BID ITEM, REPLACE THE EXISTING SUSPENDED CEILING IN THIS ROOM
PER SPECIFICATION SECTION O09 51 00 IN ADDENDUM #3.
3. ROOM MEASURES APPROXIMATELY 15’ X 15’.
PLAN
©)
ite Plans\DRAWINGS\E—003.dwg, Sep 28, 2017 — 9:10am
O
\\woodardcurran.net\shared\Projects\228730 Nashua Wastewater \wip\Drawings\;
Oo ©
\
INSTALLATION KEYED NOTES:
1. INSTALL WIRING TROUGH ABOVE PANEL LOCATION TO TERMINATE EXISTING CONDUITS.
2. INSTALL NEW SCADA CONTROL PANEL PER THIS DRAWING. SEE RISER DIAGRAM. RUN
NEW CONDUITS AND PULL NEW WIRING AS NECESSARY.
INSTALLATION PLAN
TPS FLOW
TRANSMITTER
__#t____
TPS FLOW
(1) 2C418 W/SHLD
TRANSMITTER
~~ #2 __ _
_ WAS |
THICKENER
FLOW FIT. __|
(1) 2C#18 W/SHLD
(1) 2C#18 W/SHLD
TWAS TRANSFER
WELL LEVEL
DIGESTER SLUDGE
(1) 2C#18 W/SHLD
FEED FLOW
(1) 2C#18 W/SHLD
(1) 2C418 W/SHLD
PRESS ROOM LEL
(1) 2C#18 W/SHLD
_- a
(1) 2C#18 W/SHLD
(1) 2C#18 W/SHLD
LEL
(1) 2C#18 W/SHLD
HS
(1) 2C#18 W/SHLD
(1) 2C#18 W/SHLD
(1) 2C#18 W/SHLD
(1) 2C#18 W/SHLD
HYPO FEED TANK
(1) 2C418 W/SHLD
#1 LEVEL
HYPO FEED TANK
(1) 2C418 W/SHLD
#2 LEVEL
POLYMER STORAGE
(1) 2C#18 W/SHLD
TANK #1 LEVEL
(1) 2C418 W/SHLD
(1) 2C418 W/SHLD
HYDROXIDE TANK
(1) 2C418 W/SHLD
LEVEL
(1) 2C#18 W/SHLD
INSTRUMENTATION &
SCADA
CONTROL
PANEL
1 *CP—150° |
[| ____ids
RISER DIAGRAM KEYED NOTES:
1. CONNECT ALL DEVICES AS SHOWN ON NOMINAL CORRESPONDING | SERIES DRAWINGS.
(6) #14
(6) #14
(6) #14
(6) #14
(6) #14
(6) #14
(6) #14
(6) #14
(6) #14
6) #14
(2) 26} a W/SHLD
6) #14
(2) oA df W/SHLD
6) #14
(2) of} a W/SHLD
6) #14
(2) of a W/SHLD
6) #14
(2) of a! W/SHLD
6) #14
(2) ood a! W/SHLD
6) #14
(2) otal a’ W/SHLD
6) #14
(2) ota a W/SHLD
6) #14
(2) of a W/SHLD
6) #14
(2) ood a! W/SHLD
(2) #14
(2) 2C#18 W/SHLD
(6) #14
(6) #14
(4) #14
2) #14
(2) 23 a W/SHLD
(2) #14
| 120V, 20A CIRCUIT
RISER DIAGRAM
SGNTROE
THICKENED
PRIMARY
SLUDGE PUMP
#
THICKENED
PRIMARY
SLUDGE PUMP
#2
THICKENED
PRIMARY
SLUDGE
PUMP_ #3
THICKENED
PRIMARY
SLUDGE
GRINDER _#1
THICKENED
PRIMARY
SLUDGE
GRINDER #2
THICKENED
PRIMARY
SLUDGE
GRINDER #3
WAS GRAVITY
BELT
THICKENER
tL
WAS GRAVITY
BELT
THICKENER
#2
WAS GRAVITY
BELT
THICKENER
HS
TWAS
PUMP
#
TWAS
PUMP
#2
THICKENED
POLYMER
PUMP #1
THICKENED
POLYMER
PUMP. #2
THICKENED
POLYMER
PUMP_ #3
THICKENED
POLYMER
PUMP_ #4
SCRUBBER
NAOH
PUMP. #1
SCRUBBER
NAOH
PUMP 42
SCRUBBER
NaCL
PUMP #1
SCRUBBER
NaCL
PUMP #2
WAS FLOW
METER
SCRUBBER
RECYCLE
PUMP. #1
SCRUBBER
RECYCLE
PUMP #2
SCRUBBER
LSLL/LSL
SCRUBBER
pH &
CONDUCTIVITY
TRANSMITTER
SCRUBBER
MAKUP WATER
SOLENOID
SV—MU
MCC
BUCKET
SECTIONS
E
2 146
_l Op
& am | ea
8 wu | 3
c a | ge
o Ww <o
c = 62
3 ao 22
Z Qa |5°
S$ 2-2 |##
a = ao
S E | #2
os = 19E
= wo ve] <p
So ag
Qa = 5S °
oN z Or
2s © Lu =>
£-$9 = i)
Sos E | oz
2659S = |>=
3 y = a
Des = vz
- oOo oO Wd
s+ oO o&
ro
or
a:
2 Fg
Ny
Pe be
Oi} 32
OD 38
OO] a8
S38 | 26
Tw
Ew
s
NO
on
|
©
a)
=
oe a
ws
s|, (Hs
2|S Glu
Qo
£15
a|n
o}d
o
a ale
a rie
2 5
a) als
ce z
aS
> YO]
oy; Ww} a&
x a;a
Za
Fuss
IZ
ore
Sis
bIaa
CO
2w
=O
OrY
Oo cte
we
a |
owe
reer
—=—WM UI
2277
LiJ— |}
x C5
Ox
rT
}—
>
kK
a
Za
<= uw <<
2 or
. Ko
< mae
D ——)
c FE
2 <i
Lo
z eH
ve >
Oo oY
nt]
> <<
F £O
Oo =s
Li
LW
”
<
=
JOB NO.: 228730
DATE: JULY, 2017
SCALE: N.T.S
SHEET: 5 OF 62
E-003
2