Project Number: 228730 WWYTE SCADA Upgrades
Issue Date: AugustSeptember 2017 Nashua, NH
6-033.03 LABELING REQUIREMENTS
€A.__ Number both ends of each cable with labels of waterproof materials and indelible
ink text information, using either mechanical or waterproof adhesive attachment.
6-043.04 GROUNDING REQUIREMENTS
A. Wherever necessary extend service equipment ground using min. #6 AWG
copper. In exposed locations, install ground wire in EMT. Bond all
communications raceway to form a continuous path to ground.
B. Ground patch panels, equipment racks and other communications’ equipment via
a min. #6 AWG bond connection to the appropriate grounding busbar.
C. Provide appropriate grounding for the protection of personnel, materials and
equipment conforming to all applicable regulations, codes and standards.
6-053.05 TESTING
A. Perform final verification tests after the complete cabling and connectors are
installed.
B. All cabling and outlets shall be tested for certification with an approved industry
scanner.
C. Verify that all test equipment is within the required calibration intervals. Owner
and Engineer shall be informed prior to all tests delineated in this procedure and
witnessing tests as they see fit.
D. All defects found during inspections shall be recorded. If cable systems do not
meet the requirements, it shall be removed and replaced with new cable.
E. All testing shall be documented, indicating cable designations and test results, all
cables performing inadequately shall be replaced. All test reports shall be
submitted to the Owner and Engineer.
6-063.06 FIELD QUALITY CONTROL
A. Provide in accordance with Division 01 General Requirements.
6073.07 STARTUP & COMMISSIONING
A. Provide in accordance with Division 01 General Requirements.
6-083.08 CLOSEOUT ACTIVITIES
A. Provide in accordance with Division 01 General Requirements.
END OF SECTION
ADDENDUM NO. 3 COMMUNICATIONS
WOODARD & CURRAN 27 00 00-9 _(3)