Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 11/15/2017 - P166

Finance Committee - Agenda - 11/15/2017 - P166

By dnadmin on Mon, 11/07/2022 - 10:18
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
166
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

Project Number: 228730 WWYTEFE SCADA Upgrades
Issue Date: AugustSeptember 2017 Nashua, NH

FL

KJ.

El. ALTERNATE 1 (perform only if awarded by Owner): Replace ceiling in

thickening room with ceiling tiles as specified in Section 09 51 00 and as
indicated in the General Notes on Drawing E-003.

Maintain clearances between cables and all other systems as recommended by the
cable manufacturer and system certifying entity. All cables shall be installed so as
to not violate the manufacturer’s recommended bending radius and maximum
pulling tension.

No cables shall be spliced, except those specifically indicated at the backboard.

E-K.___Provide labeling in accordance with EIA TIA/EIA-606-A. Handwritten labeling

is unacceptable.

M-L. Cables shall be labeled using color labels on both ends with identifiers in

accordance with EIA TIA/EIA-606-A.

NM._ SCADA Fiber Optic Cable
1. Fiber cable shall be installed within “inner duct” inside of all raceways.
2. Connect the blower room control panel to the new Ethernet switch in the
server / electrical room via fiber optic cable.
3. Demolish network switch control panel _and_its components in the

thickening room. Fiber optic cables shall be disconnected_and removed
individually based_on the process building where upgrades are occurring.

Sequence this work to avoid disruption to more than one process area at a
time.

4. Replace_all fiber optic cables connecting new or upgraded SCADA
components to the Ethernet_switch located_in the electrical / server room.
Fiber_optic cable shall include 50 percent_spare fibers. Use existing
subsurface conduit. See Drawing 228730-E007, Fiber Optic Site Plan,
showing the approximate cable locations and runs.

5. If existing subsurface conduit is damaged and unusable, contact Owner
and Engineer to arrange for approval of a change order_to address
trenching and conduit replacement.

6023.02 TERMINATIONS
A. Data Riser: Terminate fiber strands using the appropriate ST/SC connectors.
B. Ground patch panels via a bond connection to the appropriate communications
grounding busbar.
ADDENDUM NO. 3 COMMUNICATIONS

WOODARD & CURRAN 27 00 00-8 _(3)

Page Image
Finance Committee - Agenda - 11/15/2017 - P166

Footer menu

  • Contact