Project Number: 228730 WWYTE SCADA Upgrades
Issue Date: AugustSeptember 2017 Nashua, NH
1.03 ADMINISTRATIVE REQUIREMENTS
A. Coordination, Sequencing, and Scheduling: per Division 01 General
Requirements.
1.04 SUBMITTALS
A. Submit in accordance with the Division 01 General Requirements.
A-B. Provide manufacturer's product data, test reports, and materials certifications.
B-C. Submit a complete master wiring diagram engineering drawing of the system with
specification sheets covering all components of the system and block diagrams
indicating all components and inter-wiring (quantity and size). The system and
equipment shown in the engineering drawings and specifications shall meet all
requirements of this specification.
1.05 QUALITY ASSURANCE
A. Provide in accordance with Division 01 General Requirements.
B. Reference Standards.
1. All work shall be performed in accordance with ANSI/TIA/EIJA 568B
cabling standards.
1.06 RECORD DOCUMENTATION
A. Provide drawings in accordance with EIA TIA/EIA-606-A. Accurately record
actual locations and mounting heights of outlets if not as shown on Drawings,
plus pull and junction box locations.
B. Accurately record actual routing of conduits and cables. Indicated dimensions
from nearest column lines on the As-Built Drawings.
1.07 SITE CONDITIONS
A. Existing Conditions: per Division 01 General Requirements.
B. The Contractor shall provide the labor, tools, equipment, and materials necessary
to provide a complete data communications system in accordance with the plans
and as specified herein. This includes the furnishing and installing of complete
systems of interior raceways and junction boxes, wiring and jacks, cover plates, C
& D type clamps and hangers, including final connections and terminations at the
origination and outlet end of all cables.
ADDENDUM NO. 3 COMMUNICATIONS
WOODARD & CURRAN 27 00 00-2 _(3)