Project Number: 228730 WWYTEFE SCADA Upgrades
Issue Date: AugustSeptember 2017 Nashua, NH
SECTION 27 00 00
COMMUNICATIONS
PART 1 - GENERAL
1.01 SUMMARY
A. Furnish, install, test and make ready for operation; complete data communications
system as specified herein and as shown on the Drawings. The data system shall
include but are not limited to the following:
1. Data Devices
2. Racks and Patch Panels
3. Wire and Cable
4. Cable Terminations
1.01 PRICE AND PAYMENT PROCEDURES
A. Measurement and payment requirements: per Division 01 General Requirements.
1.02 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and
Supplementary Conditions and Division 01 specification sections, apply to this
section.
B. Related Sections
1. Division 26: Section 26 05 00 COMMON WORK RESULTS FOR
ELECTRICAL
2. Division 26: Section 26 05 33 RACEWAYS, BOXES, & SUPPORTING
DEVICES
3, Division 26: Section 26 27 26 WIRING DEVICES
1.02 REFERENCES
A. Reference Standards.
1. All work shall be performed in accordance with ANSI/TIA/EIA 568B
cabling standards.
ADDENDUM NO. 3 COMMUNICATIONS
WOODARD & CURRAN 27 00 00-1 _(3)