Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 11/15/2017 - P123

Finance Committee - Agenda - 11/15/2017 - P123

By dnadmin on Mon, 11/07/2022 - 10:18
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
123
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

A-2.3

MANUFACTURERS EXPERIENCE

Wherever it may be written that an equipment manufacturer must have a specified period of
experience with his product, equipment which does not meet the specified experience period can be
considered if the equipment supplier or manufacturer is willing to provide a bond or cash deposit
for the duration of the specified time period which will guarantee replacement of that equipment in
the event of failure.

S.A.G. PROJECT SIGN

The Contractor shall construct a sign in accordance with the Standard Detail included in these
specifications. The sign shall be erected in a location selected by the Engineer or Owner in
coordination with NHDES. The Contractor shall maintain the sign throughout the duration of the
contract.

SAFETY AND HEALTH REGULATIONS

This project is subject to all of the Safety and Health Regulations (CFR 29 Part 1926 and all
subsequent amendments) as promulgated by the U.S. Department of Labor on June 24, 1974.
Contractors shall comply with the requirements of these regulations.

NON-DISCRIMINATION IN EMPLOYMENT
Contracts for work under this proposal will obligate the contractors and sub-contractors not to
discriminate in employment practices.

STATE INSPECTION

Work performed on this project shall be subject to inspection by representatives of the NH
Department of Environmental Services. Such inspection shall in no sense make the State
Government a party to this contract, unless said Government is also the Owner, and will in no way
interfere with the rights of either party hereunder.

Representatives of the State of New Hampshire Department of Environmental Services shall be
given Right of Access to all portions of the proposed work, including but not limited to actual work
site, storage yards, offsite manufacturing and fabricating location and job records.

COPIES OF THE CONTRACT
There shall be at least five (5) executed copies of the Contract to be distributed as follows:

a. One (1) copy each to the Owner, Engineer, and Contractor.

b. Two (2) copies to the New Hampshire Department of Environmental Services.

c. Additional copies as required for other federal or state agencies contributing to or participating
in project costs.

NON-RESIDENT CONTRACTORS

The successful bidder, if a corporation established under laws other than the State of New
Hampshire, shall file, at the time of the execution of the contract, with the Owner, notice of the
name of its resident attorney, appointed as required by the laws of the State of New Hampshire.

The successful bidder, if not a resident of New Hampshire, and not a corporation, shall file, at the
time of execution of the contract, with the Owner a written appointment of a resident of the state of
New Hampshire, having an office or place of business therein, to be his true and lawful attorney

Page Image
Finance Committee - Agenda - 11/15/2017 - P123

Footer menu

  • Contact