T. Buck Construction, inc. PROPOSAL 34A
249 Merrow Rd Auburn, ME 04210
207-783-6223 * FAX 207-783-3970
ODA sac haan
Proposal Submitted to: IPhone: (802) 431-1422 Date 10/2/2017
Wright-Pierce Fax: (866) 783-7101
‘Street: Job Name
230 Commerce Way, Suite 302 Nashua Wastewater Treatment Facility Headworks Upgrade :
City, State & Zip Code: Job Location: ‘
Portsmouth, NH 03801 Nashua NH
Engineer: Job Phone:
Andy Morrill
fe hereby submit specifications and estimate for:
Provide labor, material and equipment to Install offset for wash press #1 conveyor and rework existing supports
GC Equipment (welder) $ 380.00
Labor $ 1,392.50
Material $ 3,107.25
Pipe & fittings to relocate drain $ §3.75
$ 4,933.50
16% O&P $ 740.03
$ 5,673.53
1) T Buck Construction requests and additional 10 days be added to the contract time
fe Propose heraby to furnish material and tsbor complete in accordance with above specifications, for the sum of:
FIVE THOUSAND SIX HUNDRED & SEVENTY THREE DOLLARS
Aa material is guaranteed lo be as specified. AN work to be completed in a Authorized
rkmaniike manner g fo practi Any alteration or Signature
Heviniion from above specifications involving extra costs will be executed only Bruce Kenney
Ripon written orders, and will become an extra cherge over snd above the
estimate. All agreements contigent upon strikes, accidents or delays beyond Note: This proposal may be withdrawn
be. control Owner te cany fire, tomado and other necessary insurance. Our by us if not accepted within __5 days.
workers ere fully covered by Workman's Compensation Insurance.
ceptance of Proposal- ths sbove prices, specifications and
work as specified. Payment will bs made as oulfined above
Signature
Date of acceptance