T. Buck Construction, inc.
249 Merrow Rd Auburn, ME 04210
207-783-6223 * FAX 207-783-3970
PROPOSAL
33A
Date 10/10/2017
Proposal Submitted to: Phone: (802) 431-1422
Wright-Pierce Fax: (866) 783-7101
Street: Job Nama
230 Commerce Way, Suite 302 Nashua Wastewater Treatment Facility Headworks Upgrade
ity, State & Zip Code: Job Location:
Portsmouth, NH 03801 Nashua NH
Engineer: dob Phone:
dAnd,y Morrill
hereby submit specifications and eatimate for:
Provide labor, material and equipment to demo existin
iling
Seacoast Scaffolding
ACT
pGeneral Contractor
Labor
Material
Consumables
15% O&8P
TOTAL
15% O&P
10% GC
SUB TOTAL
15% O&P
10% GC
SUB TOTAL
1) T Buck Construction requests and additional 5 days be added to the contract time
$
$
$
$
3
$
$
$
$
$
3
$ 2,347.34
3,063.00
3,063.00.
459.45
3,522.45
__ 306.30
3,828.75
667.00
661.00
99.15
780.15
66.10
826.25
g ceiling in west stairwell to headworks, install FRP/plywood wall and install new
$ 3,828.75
$ 826.25
$ 2,341.34
$ 6,998.34
ile Propose henaby to fumish matertal and jabor complete in accordance with above specifications, for the sum of:
ASIX THOUSAND NINE HUNDRED & NINETY SIX DOLLARS
}il material is quarantead to be as specified. Al work to be complated in s
peorkmanike manner according to standard practicas. Any alteration or
Keviaton from above specifications involving extra costs will be executed only
Lipon written overs, and will become an extra charge over and above the
pistimate. Ali agreements contigent upon strikes, accidents or delays beyond
Authorized
Signature
Bruce Kenney
Note. This proposal may be withdrawn
eur control. Owner to carry fire, tomade end other necessary insurance. Our by us # not accepted within 5 days.
workers are fully covared by Workman's Compensation insurance,
Acceptance of Proposal- the above prices, specifications and
Date of acceptance Signature
fx 83 specified. Payment wit bo mada as outfined above.