B-6.1
CHANGE ORDER
No. 7
PROJECT: _Headworks Upgrade == == Ss DATE OF ISSUANCE: oe
OWNER: == _City of Nashua
229 Main St, Nashua, NH 03062
CONTRACTOR: T-Buck Construction, Inc. COWNER’s ProjectNo. ae
CONTRACT FOR: — Headworks Upgrade ENGINEER _ Wright-Pierce_ ee
ENGINEER’s Project No. _ 13089
You are directed to make the following changes in the Contract Documents.
Description: Refer to the attachments.
Purpose of Change Order: Refer to the attachments.
Justification: Work was not included in original contract documents.
Attachments: Change Order No. 7 Summary Sheet, Change Order No. 7 Items 1-6 back-up documentation.
CHANGE IN CONTRACT PRICE CHANGE IN CONTRACT TIME
i Original] Contract Price Original Contract Time
$ 2,848,22200 7 ; _455 ae _
(days or date)
Previous Change Orders Net change from previous Change Orders i
S 135,332.94 _ . Bo
(days) '
oo |
Contract Price prior to this Change Order Contract Time prior to this Change Order
$ _2,983,554.94 . 528
(days or date)
Net Increase of this Change Order Net Increase this Change Order
$ 62,673.11 — (25 et
(Gays)
oe ence cen nee a
Contract Price with all approved Change Orders Contract Time with all Change Orders i
: 553 days (Substantial Completion = 10/27/2017,
$ _3,046,228.05 Final Completion = 11/27/2017)
(days or date) }
This document will become a supplement to the CONTRACT and all provisions will apply hereto. The
attached Contractor’s Revised Project Schedule reflects increases or decreases in Contract Time as
authorized by this Change Order.
Stipulated price and time adjustment includes all costs and time associated with the above described change.
Contractor waives all rights for additional time extension for said change. Contractor and Owner agree that
the price(s) and time adjustment(s) stated above are equitable and acceptable to both parties.
RECOMMENDED: APPROVED: APPROVED, é APPROMED:
By: 7 fern eed. By: Cte LZ
~TY""Engineer Owner >" Contracte: NHDES
WONW/2017— OUT {7
Date Date Date Date
13089A