Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 12/26/2017 - P31

Finance Committee - Agenda - 12/26/2017 - P31

By dnadmin on Mon, 11/07/2022 - 10:17
Document Date
Tue, 12/26/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Tue, 12/26/2017 - 00:00
Page Number
31
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__122620…

CLD Consulting Engineers
17 February 2017
Page 3

Tesi borings are completed within three rig-days. if subsurface conditions are unfavorable
(obstructions, difficult drilling, access problems, frozen ground, snow banks, or other unforeseen
problems), additional exploration time may be required at additional cost. We would inform
you of exploration progress issues, and obtain your authorization prior to undertaking additional
rig-days or exploration work.

®

e Excluded from the scope of our work is an assessment of oil or hazardous materials at the site.

° Snow removal to access locations is not included.

Fees and Other Conditions

Services will be provided in accordance with the attached “Standard Terms and Conditions 2013” and
Fee Schedule. We propose to conduct the services indicated above for the following fees:

Field Explorations and Geotechnical Report (items 1 through 8) Lump Sum $23,200
includes drilling and laboratory testing subcontractor costs of $12,700

Additional Geotechnical Engineering Consultation (Item 9) Fee Schedule
Vacuum Extraction of Soils (if the sewer line is not marked) Mobilization $400
Rate $1300/day

This proposal is valid for a period of 30 days from the date of this letter. If acceptance and authorization
to proceed are not received within that period, we reserve the right to renegotiate the estimated costs,
schedule for completion, and scope of work.

Schedule

The borings will be completed within 3 weeks of written notice-to-proceed. A final report will be issued
within 2 weeks of the completion of the field services. We would endeavor to meet any time frames
and milestones that the project may have.

Closure

If the above arrangements are satisfactory to you, please indicate your acceptance by signing and
returning one copy of this letter. When accepted by you, this proposal together with the attached
Terms and Conditions and Fee Schedule will constitute our Agreement.

Page Image
Finance Committee - Agenda - 12/26/2017 - P31

Footer menu

  • Contact