Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 2/2/2016 - P89

Finance Committee - Agenda - 2/2/2016 - P89

By dnadmin on Mon, 11/07/2022 - 09:56
Document Date
Tue, 02/02/2016 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Tue, 02/02/2016 - 00:00
Page Number
89
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__020220…

Item-No. 02B ~ REBUILD TWO (2) EXISTING 6” WAS PUMP (FAIRBANKS MODEL NO: 85423) AND INSTALL

The scope of work for this proposal item includes the followi g:
(Reference attached pictures for corresponding pump designations

° Pickup existing WAS Pump #1, that is currently got installed, from plant and transport to our facility to be rebuilt.
e Provide new OEM parts to perform comp! €rebuild of WAS Pump 41.
{See attachment for list of comporientetO be replaced)
° Deliver rebuilt WAS Pump #1 to fant.
© Replace existing WAS Pum W8 that is currently.out of service with WAS Pump #1 that was rebuilt.
e Transport WAS Pump.4? to our facility to be rebuilt:
° Deliver rebuilt WAS Pump #2 to plant.
e WAS Pump_#2 will be placed in the WAS pump room as a spare pump for the Plant’s future use.
© Alignment of WAS pump is not included.
e Painting of existing pump or piping is not included.
a “There is a four (4) week lead time on the delivery of the replacement parts.

-The-cost- forthe work destribed-above is $24,125.00

Methuen has provided Item Nos. 02A and 028 as options so you may choose the best approach to meet your operational
and budgetary needs. Either one of these options can be selected at your discretion.

Should you wish to pursue this work, please make note of the bid items selected below, and return a signed copy of the
proposal to Methuen. Thank you for the opportunity to provide you with a proposal to perform this work.

Respectfully submitted,

Jason C. Babbidge
Project Manager

This quotation is Valid for 30 days from the date of this Quotation
Acceptance of Proposal/Work Authorization

| understand that by accepting the above proposal, | am authorizing work to proceed. Payment shall be made as required
by mutually agreeable terms and conditions.

Any changes and/or modifications to the above praposal must be mutually agreed upon by Methuen Construction Co.,
Inc and incorporated via amendment to this proposal,

(Please list Bid items selected above)

Date:

(Signature)

(Printed Name}

CONSTRUCTION

Page Image
Finance Committee - Agenda - 2/2/2016 - P89

Footer menu

  • Contact