Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 2/2/2016 - P88

Finance Committee - Agenda - 2/2/2016 - P88

By dnadmin on Mon, 11/07/2022 - 09:56
Document Date
Tue, 02/02/2016 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Tue, 02/02/2016 - 00:00
Page Number
88
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__020220…

EXHIBIT A

QUOTATION

Quote No: 16-0102

DATE: FEBRUARY 2, 2016
PROJECT: NASHUA WWTP — MISC. MAINTENANCE ITEMS
LOCATION: NASHUA, NH

William Keating

Chief Estimator/Project Manager
Nashua - Wastewater Department
2 Sawmill Road

Nashua, NH 03062

In response to your request for pricing to provide Services we are pleased to submit the following for your review and
consideration:

Item No, 01 ~ 36” FLOWMETER REPLACEMENT AND 42” VICTAULIC COUPLING REPAIR
The scope of work for this proposal item includes the following:

* Provide labor, materials, and equipment required to replace existing 36” flowmeter.
¢ Methuen will provide new 36” full face gaskets required for flowmeter installation.
° The existing hardware to install the flowmeter will be reused.

e New flowmeter to be provided by the City of Nashua.

* No painting of the new flowmeter or existing piping is included.

The cost for the work described above is $15,860.00
ttem Nov O2ZA= REBUILD ONE{(1) EXISTING 6” WAS PUMP (FAIRBANKS MODEL NO>B5423) AND STALL

The scape of work roihis proposal item includes the following:
(Reference attached pictures for corresponding pump designations)

rebuilt,
° Provide new OEM parts to perform complete-rebuild of WAS Pump #1.
(See attachment for list of components to efeplaced)
® Deliver rebuilt WAS pump to Pe ™
° Replace existing WAS Pump #2-that is currently out of service with. WAS Pump #1 that was rebuilt.
e Alignment of WAS pump-i€ not included.

© Painting of existingpump or piping is not included.
e There is a fo t (4) week lead time on the delivery of the replacement parts.

° Pickup existing WAS pump Fisthat is currently not installed;from plant and transport to our facility to be

The cost for the work described above is $13,050.00

40 LOWELL ROAD 1 SALEM. NH 03079 | PE: 603.328.2222 [PAN: 603,328,223
WWW. METHUENCONSTRUCTION.COM

Page Image
Finance Committee - Agenda - 2/2/2016 - P88

Footer menu

  • Contact