tyco
Nashua Wastewater Treatment Facility
Sawmill Rd
Nashua, NH 03060
Integrated Security Estimate Name: Nashua Wastewater Treatment AC 7-16-15
Programming Info:
Site Conditions:
Customer Expectations:
Customer Responsibilities / Tyco Exclusions:
Documentation Needs:
Doors will be locked at all times unless
otherwise stated by City of Nashua. System
will be tied into WAN and will be accessible
from EntraPass software at City Hall
Existing wastewater treatment plant
building with drop ceiling in some areas and
hard ceiling in others.
M-F 8-5
City of Nashua is responsible for the
following:
1. Provide (2) 120V outlets at the location of
the KT-400 control panels.
2. Provide (1) 120V outlet at the location of
the Aiphone intercom master station in the
downstairs office area.
3. Provide network connection at the
location «ithe KT-400 control panel
4. Pro. 4e necessary IT support including IP
Add: 2sse. required to tie system in with
existing Enu °Pass software at City Hall.
*. Provide access to all areas required for
ins. allation between 8am and 5pm.
Draw «gs were not provided by the
~ctomer.
TYCO INTEGRATED SECURITY CONFIDENTIAL AND PROPRIETARY BUSINESS INFORMATION
Page 5 of 6
© TYCO 2015. ALL RIGHTS RESERVED