Division 9 — Construction Specifications
Legacy Playground at Labine Park
As Amended per Addendum # 2 issued March 24, 2016
ITEM ‘G’ — 8"X8" LANDSCAPE TIMBER BORDER
A. SCOPE
This work shall consist of installation of a landscape timber border using 8x8 treated wood
timbers at the location(s) shown on the layout plan per the detail of the plan set provided or as
ordered by the Engineer.
B. MATERIALS AND CONSTRUCTION
The Contractor shall supply all labor, materials, equipment and transportation necessary for the
required work. The timbers shall be stacked two high to provide a vertical edge border.
C. MEASUREMENT AND PAYMENT
Landscape Timber Border will be measured by the lineal foot installed. Payment for work under
these items shall be at the contract unit price per unit and shall include full compensation for
excavation, grading, material, labor, tools, equipment, disposal of construction debris (existing
sidewalk, concrete, asphalt, etc.), and any other incidentals necessary for the satisfactory
completion of this work as specified.