Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 5/3/2016 - P167

Finance Committee - Agenda - 5/3/2016 - P167

By dnadmin on Mon, 11/07/2022 - 09:54
Document Date
Tue, 05/03/2016 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Tue, 05/03/2016 - 00:00
Page Number
167
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__050320…

Division 9 — Construction Specifications
Legacy Playground at Labine Park

As Amended per Addendum # 2 issued March 24, 2016

ITEM ‘G’ — 8"X8" LANDSCAPE TIMBER BORDER
A. SCOPE

This work shall consist of installation of a landscape timber border using 8x8 treated wood
timbers at the location(s) shown on the layout plan per the detail of the plan set provided or as
ordered by the Engineer.

B. MATERIALS AND CONSTRUCTION

The Contractor shall supply all labor, materials, equipment and transportation necessary for the
required work. The timbers shall be stacked two high to provide a vertical edge border.

C. MEASUREMENT AND PAYMENT

Landscape Timber Border will be measured by the lineal foot installed. Payment for work under
these items shall be at the contract unit price per unit and shall include full compensation for
excavation, grading, material, labor, tools, equipment, disposal of construction debris (existing
sidewalk, concrete, asphalt, etc.), and any other incidentals necessary for the satisfactory
completion of this work as specified.

Page Image
Finance Committee - Agenda - 5/3/2016 - P167

Footer menu

  • Contact