Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 5/3/2016 - P151

Finance Committee - Agenda - 5/3/2016 - P151

By dnadmin on Mon, 11/07/2022 - 09:54
Document Date
Tue, 05/03/2016 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Tue, 05/03/2016 - 00:00
Page Number
151
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__050320…

Division 9 — Construction Specifications
Legacy Playground at Labine Park

As Amended per Addendum # 2 issued March 24, 2016

ITEM ‘A’ — STAMPED CONCRETE WALKWAY (6") (COBBLESTONE PATTERN)
A. SCOPE

This work shall consist of installation of a stamped concrete walkway at the location(s) shown
on the layout plan per the detail of the plan set provided or as ordered by the Engineer.

B. MATERIALS AND CONSTRUCTION

The Contractor shall supply all labor, materials, equipment and transportation necessary for the
required work. The concrete shall be installed at a 6” depth and be stamped with a random
cobblestone pattern.

C. MEASUREMENT AND PAYMENT

Stamped Concrete Walkway will be measured by the number of square feet installed. Payment
for work under these items shall be at the contract unit price per unit and shall include full
compensation for excavation, grading, concrete, forms, labor, tools, equipment, disposal of
construction debris (existing sidewalk, concrete, asphalt, etc.), and any other incidentals
necessary for the satisfactory completion of this work as specified.

Page Image
Finance Committee - Agenda - 5/3/2016 - P151

Footer menu

  • Contact