Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 5/3/2016 - P150

Finance Committee - Agenda - 5/3/2016 - P150

By dnadmin on Mon, 11/07/2022 - 09:54
Document Date
Tue, 05/03/2016 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Tue, 05/03/2016 - 00:00
Page Number
150
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__050320…

Division 9 — Construction Specifications
Legacy Playground at Labine Park

As Amended per Addendum # 2 issued March 24, 2016

All Items that are not included in the special provision shall comply with the latest approved
NHDOT Standard Specifications for Road and Bridge Construction, the latest approved City of
Nashua Standard Specifications for Road Construction Sewer and Drains, the latest approved
NHDOT Standard Plans for Construction and the latest approved edition of Manual of Uniform
Traffic Control Devices. The most stringent specification shall apply.

Unless otherwise noted all work will be paid for by the quantity actually installed.

Additional Technical Specifications

ITEM ‘670.95’ — TEMPORARY SAFETY FENCE
A. SCOPE

This work shall consist of installation of a temporary safety fence around the project site or as
ordered by the Engineer.

B. MATERIALS AND CONSTRUCTION

The Contractor shall supply all labor, materials, equipment and transportation necessary for the
required work. The fencing shall consist of a temporary 6’ tall chain link fence as per the detail
of the plan set provided.

C. MEASUREMENT AND PAYMENT

Temporary Safety Fence will be measured by the number of linear feet installed. Payment for
work under these items shall be at the contract unit price per unit and shall include full
compensation for excavation, grading, labor, tools, equipment, disposal of construction debris
(existing sidewalk, concrete, asphalt, etc.), and any other incidentals necessary for the
satisfactory completion of this work as specified.

Page Image
Finance Committee - Agenda - 5/3/2016 - P150

Footer menu

  • Contact