Page 2 of 2
Part Ill Price Summary
Competitors Catalog Listings, In-house Estimates, Prior Market Proposed
Quotes Price(s) Price
(Indicate basis for price comparison)
Total
Part IV Direct Labor by Category
14. Insert the appropriate work category in the table below. Work categories would include but not be limited
to those categories shown in the Contract Documents such as design, survey, subsurface, cadastral, O&M
Manual, administration, inspection, record drawings, start-up, special services etc.
Work Heat Heat Digester .
Digester Total
Category Exchanger | Exchanger | Fan . Rate Cost
. . . Fan Bid Hours
Design Bid Design
Project
roles 10 2 12 $62.32 $748
Manager
Project
. 62 4 9 1 76 $35.00 $2,660
Engineer
Project
Engineer 4 4 $52.50 $210
Structural
Project
Engineer 10 36 2 48 $48.50 $2,328
Mechanical
Project
Engineer 30 4 34 $60.00 $2,040
Instrument.
Project
Engineer 6 4 10 $65.00 S650
Electrical
CAD
i 68 36 104 $33.00 $3,432
Technician
Admin.
16 5 21 20.00 420
Assistant ° °
202 8 96 3 309 $12,488