A. Remove adhesive spills from playground safety surfacing tiles in accordance with
manufacturer's instructions.
B. Clean tiles in accordance with manufacturer's instructions.
3.6 PROTECTION
A. Protect playground safety surfacing tiles from foot traffic for a minimum of 12 hours
after installation.
B. Protect completed tiles from damage during construction.
c MEASUREMENT AND PAYMENT
Protective Surfacing will be measured by the number of square feet installed. Payment for work under
these items shall be at the contract unit price per unit and shall include full compensation for excavation,
grading, base materials, materials, labor, tools, equipment, disposal of construction debris (existing
sidewalk, concrete, asphalt, etc.), and any other incidentals necessary for the satisfactory completion of
this work as specified.