B. Ramps:
i
Z.
3.
Prefabricated Ramps: “SofRAMP Jr.”.
Prefabricated ADA-Compliant Ramps: “SofRAMP ADA”.
Material: Same as playground safety surfacing tiles.
CG. Adhesive: Furnished by manufacturer.
PART 3 EXECUTION
3.1 EXAMINATION
A. Examine areas to receive playground safety surfacing tiles. Notify Architect if areas are
not acceptable. Do not begin installation until unacceptable conditions have been
corrected.
3.2 PREPARATION
A. Prepare subsurface in accordance with manufacturer's instructions to ensure proper
slope, support and drainage for playground safety surfacing tiles.
B. Granular Aggregate Subsurface: Compacted, granular aggregate subsurface shall be as
specified in Section 02 (32 |
G Concrete Subsurface:
Wn [S ]bu [NS [eS
Concrete subsurface shall be as specified in Section 03300 (03 30 00).
Apply light broom finish.
Ensure concrete is sound with no loose material or cracks over 1/8 inch wide.
Ensure concrete is a minimum of 10 days old.
Test concrete for moisture in accordance with manufacturer's instructions to
ensure it has sufficiently cured and is dry.
Power wash existing concrete in accordance with manufacturer's instructions.
D. Asphalt Subsurface:
i;
2.
Bs
4.
Asphalt subsurface shall be as specified in Section 02 (32 }
Ensure asphalt is sound with no loose material or cracks over 1/8 inch wide.
Ensure asphalt is a minimum of 14 days old.
Test asphalt for moisture in accordance with manufacturer's instructions to ensure
it has sufficiently cured and is dry.
14 ADDENDUM 2